My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-03-11_REVISION - C1982057 (3)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1982057
>
2016-03-11_REVISION - C1982057 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:20:01 PM
Creation date
3/11/2016 1:59:14 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982057
IBM Index Class Name
Revision
Doc Date
3/11/2016
Doc Name
Reclamation Cost Estimate
From
DRMS
To
Jerry Nettleton
Type & Sequence
RN6
Email Name
JHB
JRS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
100
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Task description: <br />Site: Seneca H -W Mine <br />BULLDOZER WORK <br />Grade Culvert Embankments <br />PROJECT IDENTIFICATION <br />Task #: 029 <br />Date: 1/29/2016 <br />User: JHB <br />Permit Action: RN6 <br />State: Colorado <br />County: Routt <br />Agency or organization name: DRMS <br />Permit/Job#: C1982057 <br />Abbreviation: None <br />Filename: C057-029 <br />HOURLY EQUIPMENT COST <br />Basic Machine: Cat DI IR - I IU <br />Horsepower: 850 <br />Blade Type: Universal <br />Attachment: 3 -shank ripper <br />Shift Basis: 1 per day <br />Data Source: (CRG) <br />Cost Breakdown: <br />Utilization % <br />Ownership Cost/Hour: $189.56 <br />NA <br />Operating Cost/Hour: $308.78 <br />100 <br />Ripper op. Cost/Hour: $0.00 <br />0 <br />Operator Cost/Hour: $38.01 <br />NA <br />Total unit Cost/Hour: $536.35 <br />Total Fleet Cost/Hour: $2,145.39 <br />MATERIAL QUANTITIES <br />Initial Volume: 270,000 <br />Swell factor: 1.000 <br />Loose volume: 270,000 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell Cat Handbook <br />factor: <br />I Is, [1111.,1aW9tWI1list Y ex,I <br />Average push distance: <br />Unadjusted hourly <br />production: <br />Materials consistency <br />description: <br />Average push <br />gradient: <br />Average site altitude: <br />Material weight: <br />100 feet <br />2,870.3 LCY/hr <br />Consolidated stockpile 1.0 <br />0% <br />7,500 feet <br />2.650 lbs/LCY <br />Weight description: Decomposed rock - 25% Rock, 75% Earth <br />Job Condition Correction Factor Source <br />Operator Skill: 0.750 (AVG.) <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.