Laserfiche WebLink
BULLDOZER RIPPING WORK <br />Task description: Rip Facilities Area <br />Site: Seneca II -W Mine Permit Action: RN6 <br />PROJECT IDENTIFICATION <br />Task #: 020 <br />Date: 1/15/2016 <br />1:41:32 PM <br />State: Colorado <br />County: Routt <br />User: JHB <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: Cat Dl IR - 11U <br />Ripper Attachment: 3 -Shank Ripper <br />Cost Breakdown: <br />Permit/Job#: C1982057 <br />Abbreviation: None <br />Filename: C057-020 <br />Horsepower: 850 <br />Shift Basis: 1 per day <br />Data Source: (CRG) <br />Total Fleet Cost/Hour: $1,100.57 <br />MATERIAL QUANTITIES <br />Alternate Methods: <br />Selected estimating method: Area <br />Seismic: NA Bank Volume: <br />NA <br />Utilization % <br />Ownership Cost/Hour: <br />$189.56 <br />NA <br />Operating Cost/Hour: <br />$308.78 <br />100 <br />Ripper Operating Cost/Hour: <br />$13.94 <br />100 <br />Operator Cost/Hour: <br />$38.01 <br />NA <br />Total Unit Cost/Hour: <br />$550.28 <br />feet/second <br />Total Fleet Cost/Hour: $1,100.57 <br />MATERIAL QUANTITIES <br />Alternate Methods: <br />Selected estimating method: Area <br />Seismic: NA Bank Volume: <br />NA <br />BCY NA <br />Area: 17.50 acres Rip Depth (ft): <br />3.00 <br />Volume: 84,700 <br />Source of estimated quantity: Page 25-1-19 <br />HOURLY PRODUCTION <br />Seismic: <br />Seismic Velocity: <br />NA <br />feet/second <br />Area: <br />Average Ripping Depth: <br />3.51 <br />mph <br />Average Ripping Width: <br />9.83 <br />degrees <br />Average Ripping Length: <br />300.00 <br />feet <br />Average Dozer Speed: <br />88.00 <br />feet <br />Average Maneuver Time: <br />0.25 <br />feet <br />Production per unit area: <br />1.110 <br />acres/hour <br />Job Condition Correction Factors <br />Unadjusted Hourly Unit Production: <br />1.110 <br />Acres/hr <br />Site Altitude: <br />7,500 <br />feet <br />Altitude Adj: <br />1.00 <br />(CAT HB) <br />Job Efficiency: <br />0.83 <br />(1 shift/day) <br />Net Correction: <br />0.83 <br />multiplier <br />Adjusted Hourly Unit Production: <br />0.92 <br />Acres/hr <br />Adjusted Hourly Fleet Production: <br />1.84 <br />Acres/hr <br />BCY or CCY <br />CIRCES Cost Estimating Software <br />