My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-03-11_REVISION - C1982057 (3)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1982057
>
2016-03-11_REVISION - C1982057 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:20:01 PM
Creation date
3/11/2016 1:59:14 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982057
IBM Index Class Name
Revision
Doc Date
3/11/2016
Doc Name
Reclamation Cost Estimate
From
DRMS
To
Jerry Nettleton
Type & Sequence
RN6
Email Name
JHB
JRS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
100
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Task description: <br />Site: Seneca II -W Mine <br />BULLDOZER WORK <br />Doze Adjacent South Wadge Pit Spoil Ridges <br />Permit Action: RN6 Permit/Job#: C1982057 <br />PROJECT IDENTIFICATIOIS <br />Task #: 010 <br />Date: 1/15/2016 <br />1:51:33 PM <br />User: JHB <br />State: Colorado <br />County: Routt <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: <br />Cat DI IR - 11U <br />Horsepower: <br />850 <br />Blade Type: <br />Universal <br />Attachment: <br />3 -shank ripper <br />Shift Basis: <br />1 per day <br />Data Source: <br />(CRG) <br />Cost Breakdown: <br />Utilization % <br />Ownership Cost/Hour: $189.56 NA <br />Operating Cost/Hour: $308.78 100 <br />Ripper op. Cost/Hour: $0.00 0 <br />Operator Cost/flour: $38.01 NA <br />Total unit Cost/Hour: $536.35 <br />Total Fleet Cost/Hour: $2,145.39 <br />MATERIAL QUANTITIES <br />Initial Volume: 461,500 <br />Swell factor: 1.000 <br />Loose volume: 461,500 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell Cat Handbook <br />factor: <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly <br />production: <br />Materials consistency <br />description: <br />Average push <br />gradient: <br />Average site altitude: <br />Material weight: <br />Weight description: <br />250 feet <br />1,264.9 LCY/hr <br />Loose stockpile 1.2 <br />-15% <br />8,000 feet <br />2,550 lbs/LCY <br />Sandstone <br />Abbreviation: None <br />Filename: C082-010 <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.