Laserfiche WebLink
SCRAPER TEAM WORK <br />Task description: Replace Topsoil from Stockpile to Haul Road I <br />Site: Seneca H -W Mine Permit Action: RN6 Permit/Job#: C1982057 <br />PROJECT IDENTIFICATION <br />Task #: 054 State: Colorado <br />Date: 1/29/2016 County: Routt <br />User: JHB <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT <br />-Scraper: Cat 637G <br />-Dozer:. NA <br />Abbreviation: None <br />Filename: C057-054 <br />COSTShift basis: 1 per day <br />Support Equipment -Load Area: NA <br />-Dump Area: NA <br />Road Maintenance —Motor Grader: CAT 14M <br />-Water Truck: Water Tanker, 10,000 Gal. <br />Cost Breakdown: Scraper Work Team Support Eauinment Maintenance Eauinment <br />Total work team cost/hour: $1,717.38 <br />MATERIAL QUANTITIES <br />Initial volume: 29,171 CCY Swell factor: 1.000 <br />Loose volume: 29,171 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Material weight: 2,100 lbs/LCY <br />Material description: Earth - Loam <br />Rated Payload: 81,600 pounds <br />Payload Capacity: 38.86 LCY <br />Scraper Bowl (volume,) Basis: <br />Struck Volume: 24.00 LCY <br />Heaped Volume: 34.00 LCY <br />Average Volume: 29.00 LCY <br />Adjusted Capacity: 29.00 LCY <br />CIRCES Cost Estimating Software <br />Scraper <br />Dozer <br />Load Area <br />Dump Area <br />Motor Grader <br />Water Truck <br />%Utilization -machine: <br />100 <br />NA <br />NA <br />NA <br />25 <br />25 <br />Ownership cost/hour: <br />$110.90 <br />NA <br />NA <br />NA <br />$42.03 <br />$52.28 <br />Operating cost/hour: <br />$243.12 <br />NA <br />NA <br />NA <br />$17.47 <br />$30.77 <br />Ripper op. cost/hour: <br />NA <br />NA <br />NA <br />NA <br />$0.00 <br />$0.00 <br />Operator cost/hour: <br />$33.56 <br />NA <br />NA <br />NA <br />$24.47 <br />$0.00 <br />Unit Subtotals: <br />$387.59 <br />NA <br />NA <br />NA <br />$83.96 <br />$83.06 <br />Number of Units: <br />4 <br />0 <br />0 <br />0 <br />1 <br />1 <br />Group Subtotals: <br />Work: <br />$1,550.36 <br />Support: <br />$0.00 <br />Maint: <br />$167.02 <br />Total work team cost/hour: $1,717.38 <br />MATERIAL QUANTITIES <br />Initial volume: 29,171 CCY Swell factor: 1.000 <br />Loose volume: 29,171 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Material weight: 2,100 lbs/LCY <br />Material description: Earth - Loam <br />Rated Payload: 81,600 pounds <br />Payload Capacity: 38.86 LCY <br />Scraper Bowl (volume,) Basis: <br />Struck Volume: 24.00 LCY <br />Heaped Volume: 34.00 LCY <br />Average Volume: 29.00 LCY <br />Adjusted Capacity: 29.00 LCY <br />CIRCES Cost Estimating Software <br />