Laserfiche WebLink
Task description: <br />Site: Seneca H -W Mine <br />IaEel Eel aa"mn03aaLy, wel'] <br />Grade Haul Roads to Blend <br />PROJECT IDENTIFICATION <br />Permit Action: RN6 <br />Task #: 030 State: Colorado <br />Date: 2/4/2016 County: Routt <br />User: JHB <br />Agency or organization name: DRMS <br />Permit/Job#: C1982057 <br />Abbreviation: None <br />Filename: C057-030 <br />HOURLY EQUIPMENT COST <br />Basic Machine: CAT 14M Horsepower: 259 <br />Ripper Attachment: Multi -Shank Ripper Shift Basis: 1 per day <br />Data Source: (CRG) <br />Cost Breakdown: <br />Total Fleet Cost/Hour: $143.34 <br />MATERIAL QUANTITIES <br />Total Area to be graded or ripped: <br />Source of estimated acreage: <br />HOURLY PRODUCTION <br />127.38 <br />SL2 Cost Estimate and PR6 Cost Estimate <br />acres <br />Average Grader Speed: <br />1.50 <br />Utilization % <br />Ownership Cost/Hour: <br />$45.44 <br />NA <br />Operating Cost/Hour: <br />$69.88 <br />100 <br />Ripper Operating Cost/flour: <br />$0.00 <br />0 <br />Operator Cost/Hour: <br />$24.47 <br />NA <br />Total Unit Cost/Hour: <br />$139.78 <br />Unadjusted Hourly Unit Production: <br />Total Fleet Cost/Hour: $143.34 <br />MATERIAL QUANTITIES <br />Total Area to be graded or ripped: <br />Source of estimated acreage: <br />HOURLY PRODUCTION <br />127.38 <br />SL2 Cost Estimate and PR6 Cost Estimate <br />acres <br />Average Grader Speed: <br />1.50 <br />mph <br />Selected Application: <br />Finish grading (0-2.5 mph) - 1.5 <br />Selected Blade Angle: <br />30 <br />degrees <br />Effective Blade Length: <br />12.10 <br />feet <br />Width of blade overlap per pass: <br />2.00 <br />feet <br />Net grading or ripping width per pass: <br />10.10 <br />feet <br />Unadjusted Hourly Unit Production: <br />1.8364 <br />acres/hour <br />Job Condition Correction Factors <br />Site Altitude: 7500 feet <br />Source <br />Altitude Adj: 1.00 (CAT HB) <br />Job Efficiency: 0.85 (1sh/d, mod.) <br />Net Correction: 0.8500 multiplier <br />Adjusted Hourly Unit Production: 1.5609 <br />Adjusted Hourly Fleet Production: 1.5609 <br />JOB TIME AND COST <br />Fleet size: 1 <br />Grader(s) Total job time: <br />acres/Hour <br />acres/Hour <br />81.61 Hours <br />Unit cost: $89.55 per acre Total job cost: $11,407 <br />CIRCES Cost Estimating Software <br />