Laserfiche WebLink
Demo Worksheet Cont'd Task # TTT Page 47 of 47 <br />Culvert - Wash Plant II <br />40 LF (2) <br />Pipe, corrugated <br />80.00 <br />LF <br />$4.98 <br />$398.40 <br />Area <br />metal (CMP) - 36 <br />in. diameter i e <br />Culvert - Wash Plant II <br />210 LF <br />Pipe, corrugated <br />210.00 <br />LF <br />$2.46 <br />$516.60 <br />Area <br />metal (CMP) - 18 <br />in. diameter pipe <br />Culvert - WMD Stability <br />50 LF <br />Pipe, corrugated <br />50.00 <br />LF <br />$6.24 <br />$312.00 <br />Borehole <br />metal (CMP) - 48 <br />in. diameter pipe <br />Culvert - 16 LT Access <br />30 LF (6) <br />Pipe, corrugated <br />180.00 <br />LF <br />$4.57 <br />$822.60 <br />Road <br />metal (CMP) - 30 <br />in. diameter pipe <br />Culvert - Security Building <br />8 LF <br />Pipe, corrugated <br />8.00 <br />LF <br />$4.98 <br />$39.84 <br />metal (CMP) - 36 <br />in. diameter pipe <br />6 North Main Powerlines <br />1500 LF <br />Powerline or <br />1,500.00 <br />LF <br />$2.68 <br />$4,020.00 <br />telephone line, <br />overhead, wood - <br />Sin le pole <br />Fish Creek Borehole <br />1800 CY <br />Loading and 5 mile <br />1,800.00 <br />CY <br />$10.57 <br />$19,026.00 <br />Electrocoagulation <br />haul, salvage <br />Containers <br />allowed - Steel <br />frame structures <br />Fish Creek Borehole <br />25X25' <br />Demo. and on-site <br />625.00 <br />SF <br />$1.48 <br />$925.00 <br />Electrocoagulation Pad <br />disposal in existing <br />pit, 8 in. thick - <br />Max. 10,000 ft. haul <br />Portable Storage Units <br />60'X40'(12) <br />Bldg. (SN) <br />2,400.00 <br />CF <br />$0.19 <br />$453.60 <br />demo./on-site <br />disposal in existing <br />pit or cut - Max. <br />10,000 ft. haul <br />Portable Propane Tank <br />12,000E <br />Haul tank to <br />1.00 <br />EA <br />$1,050.00 <br />$1,050.00 <br />12,000G <br />certified salvage <br />dump - 9,000 to <br />12,000 gal. tank <br />Portable Propane Tank <br />3,000G <br />Haul tank to <br />1.00 <br />EA <br />$760.00 <br />$760.00 <br />3,000G <br />certified salvage <br />dump - 3,000 to <br />5,000 gal. tank <br />Portable Propane Tank <br />144 SF <br />Demo. and on-site <br />144.00 <br />SF <br />$1.52 <br />$219.31 <br />Saddles <br />disposal in existing <br />pit, 8 in. thick - <br />Max. 200 ft. push <br />7RT Thickener Pipeline; <br />48" D <br />Pipe, reinforced <br />20.00 <br />LF <br />$16.65 <br />$333.00 <br />Remove Precast Manholes <br />concrete (RCP) - 48 <br />in. diameter pipe <br />7RT Thickener Pipline; <br />12" <br />Pipe, sewer/water - <br />6.00 <br />LF <br />$2.17 <br />$13.02 <br />Cut-off Pipeline below <br />12 in. diameter pipe <br />grade <br />5MN Pipeline; MR288; 5 <br />10' Diam. <br />Pipe, corrugated <br />45.00 <br />LF <br />$46.91 <br />$2,110.95 <br />CMP Risers <br />metal (CMP) - 120 <br />in. diameter pipe <br />Total Cost <br />Subtotal (adjusted for <br />Job Hours: 3,982.00 (unadjusted): $2,835,166.83 location): $2,784,133.83 <br />CIRCES Cost Estimating Software <br />