Laserfiche WebLink
Demo Worksheet Cont'd Task # TTT <br />Page 30 of 47 <br />Fish Creek Borehole <br />40 LF <br />Demo. and on-site <br />40.00 <br />LF <br />$10.08 <br />$403.24 <br />Utility Building Footers <br />disposal in <br />excavated pit, 1.5 ft. <br />x 3 ft. - Max. 200 ft. <br />push <br />Emerald Spring Site 114 <br />10'X10'X8' <br />Bldg. (MN) <br />800.00 <br />CF <br />$0.22 <br />$172.00 <br />Pumphouse <br />demo./on-site <br />disposal in existing <br />pit or cut - Max. <br />10,000 ft. haul <br />Emerald Spring Site 114 <br />101X10' <br />Demo. and on-site <br />100.00 <br />SF <br />$1.11 <br />$111.00 <br />Pumphouse Pad <br />disposal in existing <br />pit, 6 in. thick - <br />Max. 10,000 ft. haul <br />Mine Area Powerlines <br />29640 LF <br />Powerline or <br />29,640.00 <br />LF <br />$2.68 <br />$79,435.20 <br />telephone line, <br />overhead, wood - <br />Sin le pole <br />Mine Ara Fencing <br />24000 LF (2) <br />Fencing, barbed <br />48,000.00 <br />LF <br />$1.40 <br />$67,200.00 <br />Installationand Removal <br />wire, - 3 strand <br />Fish Creek Tipple <br />5030 LF <br />Powerline or <br />5,030.00 <br />LF <br />$2.68 <br />$13,480.40 <br />Powerline <br />telephone line, <br />overhead, wood - <br />Single pole <br />Fish Creek Tipple Fencing <br />6000 LF <br />Fencing, barbed <br />6,000.00 <br />LF <br />$2.15 <br />$12,900.00 <br />Removal <br />wire, - 5 strand <br />Substation #1 <br />2876 CF <br />Bldg. (MN) <br />2,876.00 <br />CF <br />$0.22 <br />$618.34 <br />demo./on-site <br />disposal in existing <br />pit or cut - Max. <br />10,000 ft. haul <br />Substation#1 Pads <br />1163 SF <br />Demo. and on-site <br />1,163.00 <br />SF <br />$1.11 <br />$1,290.93 <br />disposal in existing <br />pit, 6 in. thick - <br />Max. 10,000 ft. haul <br />Substation #1 Footers <br />194 LF <br />Demo. and on-site <br />194.00 <br />LF <br />$4.44 <br />$861.36 <br />disposal in existing <br />pit, 1.0 ft. x 2 ft. - <br />Max. 10,000 ft. haul <br />Substation #1 <br />1 Ton <br />NON -PCB <br />5.00 <br />EA <br />$2,505.00 <br />$12,525.00 <br />Transformers <br />Transformer <br />Removal <br />Substation #1 Fencing <br />348 LF <br />Fencing, chain link, <br />348.00 <br />LF <br />$2.60 <br />$904.80 <br />including posts and <br />fabric - to 6 ft. high <br />Surfactant Building <br />6800 CF <br />Bldg. (MN) <br />6,800.00 <br />CF <br />$0.22 <br />$1,462.00 <br />demo./on-site <br />disposal in existing <br />pit or cut - Max. <br />10,000 ft. haul <br />Surfacant Building <br />24X24' <br />Demo. and on-site <br />576.00 <br />SF <br />$2.22 <br />$1,278.72 <br />Foundation <br />disposal in existing <br />pit, 12 in. thick - <br />Max. 10,000 ft. haul <br />Surfacant 8,000G Tank <br />8000G <br />Haul tank to <br />1.00 <br />EA <br />$880.00 <br />$880.00 <br />certified salvage <br />dump - 6,000 to <br />8,000 gal. tank <br />CIRCES Cost Estimating Software <br />