Laserfiche WebLink
Demo Worksheet Cont'd Task # TTT <br />SCRAPER TEAM WORK <br />Task description: Replace Topsoil at Refuse Area, Refuse Area Expansion Phase <br />Site: Foidel Creek Mine Permit Action: SI2 Permit/Job#: C1982056 <br />PROJECT IDENTIFICATION <br />Task #: 134 State <br />Date: 3/10/2016 County <br />User: JLE <br />Colorado <br />Routt <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT <br />COSTShift basis: 1 per day <br />-Scraper: Cat 637G w/push- <br />-Dozer: NA <br />Support Equipment -Load Area: Cat D10T - l OSU <br />-Dump Area: Cat D10T - IOSU <br />Road Maintenance -Motor Grader: CAT 14M <br />-Water Truck: Water Tanker, 5,000 Gal. <br />Page 7 of 47 <br />Abbreviation: None <br />Filename: 134 <br />Cost Breakdown: Scraper Work Team Support Eauipment Maintenance EQUipment <br />Total work team cost/hour: $3,174.14 <br />MATERIAL OUANTITIES <br />Initial volume: 541,021 CCY Swell factor: 1.125 <br />Loose volume: 608,649 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety TR67 <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Scraper <br />Dozer <br />Load Area <br />Dump Area <br />Motor Grader <br />Water Truck <br />%Utilization -machine: <br />100 <br />NA <br />100 <br />50 <br />50 <br />50 <br />Ownership cost/hour: <br />$132.77 <br />NA <br />$133.56 <br />$133.56 <br />$46.96 <br />$24.27 <br />Operating cost/hour: <br />$229.20 <br />NA <br />$173.02 <br />$86.51 <br />$34.47 <br />$21.43 <br />Ripper op. cost/hour: <br />NA <br />NA <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />Operator cost/hour: <br />$34.24 <br />NA <br />$38.89 <br />$38.89 <br />$35.83 <br />$29.42 <br />Unit Subtotals: <br />$396.22 <br />NA <br />$345.47 <br />$258.96 <br />$117.27 <br />$75.12 <br />Number of Units: <br />6 <br />0 <br />1 <br />1 <br />1 <br />1 <br />Group Subtotals: <br />Work: <br />$2,377.32 <br />Support: <br />$604.43 <br />Maint: <br />$192.39 <br />Total work team cost/hour: $3,174.14 <br />MATERIAL OUANTITIES <br />Initial volume: 541,021 CCY Swell factor: 1.125 <br />Loose volume: 608,649 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety TR67 <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />CIRCES Cost Estimating Software <br />Scraper Bowl (volume) <br />Basis: <br />Material weight: <br />2,550 lbs/LCY <br />Struck Volume: <br />24.00 <br />LCY <br />Material description: <br />Earth - Dry packed <br />Heaped Volume: <br />34.00 <br />LCY <br />Rated Payload: <br />81,600 pounds <br />Average Volume: <br />29.00 <br />LCY <br />Payload Capacity: <br />32.00 LCY <br />Adjusted Capacity: <br />29.00 <br />LCY <br />CIRCES Cost Estimating Software <br />