My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-03-08_REPORT - M1977342
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1977342
>
2016-03-08_REPORT - M1977342
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/17/2020 10:08:13 PM
Creation date
3/10/2016 9:19:46 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977342
IBM Index Class Name
Report
Doc Date
3/8/2016
Doc Name
Annual Fee, Report & Map
From
Henderson Mine
To
DRMS
Annual Report Year
2016
Email Name
PSH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
- 1 - <br /> COMPLETED BY 27107 ON 5/19/2015 . COPIES GIVEN TO TIM HAYNES & <br /> CURTIS BROWN. <br /> LEAK DOWN TEST OF SEEP WATER LINE <br /> SUPRVSR. APPROVAL: Lenny Owens <br /> LAST REVIEW DATE: 05/22/2015 <br /> PROVIDE COPIES TO TIM HAYNES .AND CURTIS BROWN UPON <br /> COMPLETEION. <br /> 1 .X Shut the Intake Valves and make sure that they do <br /> not leak by - checking discharge valves for water <br /> flow. <br /> 1b.X Shut off lower ball valves East side of road I70 gate <br /> 2 ._X Close discharge valves for drain line and overflow <br /> line. <br /> 3 . X Fill drain line and overflow line and check discharge <br /> valves for leaks. <br /> 4 ._X Lock all valves and read pressure gauge at the <br /> discharge valves . <br /> 5 ._X Lock all valves and read pressure gauges at the <br /> discharge valves : <br /> Drain Line Pressure_75psi Date/Time_5-18-15 <br /> Overflow Line Pressure 70 Date/Time 5-18-15 <br /> G. Wait over 24 hours and read Pressure gauges: <br /> Drain Line Pressure 75 Date/Time 5-19-15 <br /> Overflow Line Pressure 70 Date/Time 5-19-15 <br /> 7 ._x If there isn' t a drop in pressure in the 24 hour <br /> period you can remove the locks . Open the intake <br /> valves first, then the discharge valves and return <br /> the system back to the pond operators . <br /> 8 . - <br /> If there is a drop in pressure note the pressure drop <br /> and repair the system, possible leaking pipes or <br /> valves. <br /> 9 ._x All machine guards are in good condition, have no <br /> open holes and are properly installed. <br /> 10 .x Pickup area after PM is done. Ensure housekeeping is <br /> in good order. <br />
The URL can be used to link to this page
Your browser does not support the video tag.