Laserfiche WebLink
Other Reclamation Permits held by Prospective Successor(if applicable): <br /> Mesa Gravel Pit - M-1982-036 i vi or"�le�r5 <br /> G «�2 as, <br /> 1C 1 CIA, I <br /> SIGN DESIGNATION OF REVIEW TIMELINE <br /> HERE <br /> ,�s explained above, the Permittee and Prospective Successor may waive their right to receive a <br /> ision on an Application within 30 days in order to allow the Division to calculate the required <br /> F aticial Warranty before issuing its decision. Permittee and Prospective Successor must initial <br /> .V <br /> the following two options to designate their choice. If Permittee and Prospective <br /> uccessor cannot agree, the Division will render its decision within 30 days. <br /> I have reviewed the information provided in this Application <br /> Permitte Packet, as well as the applicable Act and Rules. Having been fully <br /> informed, I wish to WAIVE MY RIGHT TO A DECISION ON <br /> Prospep ive Successor M'APPLICATION WITHIN 30 DAYS. <br /> I have reviewed the information provided in this Application <br /> Permittee Packet, as well as the applicable Act and Rules. Having been fully <br /> informed, I wish to MAINTAIN MY RIGHT TO A DECISION <br /> Prospective Successor ON MY APPLICATION WITHIN 30 DAYS. <br /> The Prospective Successor must provide an adequate Financial Warranty or conditional <br /> replacement Financial Warranty, consistent with the designation above. Hard Rock and <br /> Construction Materials Rule 4.3 describes the various acceptable types of Financial Warranties. <br /> Each Financial Warranty must be submitted on the Board's approved forms (available online at <br /> hlt2://mining.state.co.us/Mineral%2OFonn .htm). <br /> - 6 - <br />