My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-03-09_REVISION - C1981019
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981019
>
2016-03-09_REVISION - C1981019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:19:58 PM
Creation date
3/9/2016 10:32:06 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
Revision
Doc Date
3/9/2016
Doc Name
Adequacy Review
From
Colowyo Coal Company L.P.
To
DRMS
Type & Sequence
MR151
Email Name
ZTT
JRS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COST SUMMARY WORK <br />Task description: Reclaim Emergency Access Road to Power Pole <br />Site: Colowyo Coal Mine Permit Action: MR151 Permit/Job#: C1981019 <br />PROJECT IDENTIFICATION <br />Task #: 000 State: Colorado <br />Date: 3/9/2016 County: Moffat <br />User: ZTT <br />Agency or organization name: DRMS <br />TASK LIST (DIRECT COSTS) <br />Abbreviation: None <br />Filename: CO 19-000 <br />Task <br />0.00 <br />Form <br />Fleet <br />Task <br />2.02 <br />Performance bond: <br />Description <br />Used <br />Size <br />Hours <br />Cost <br />001 <br />Regrade Topsoil for Emergency Access Road to <br />DOZER <br />1 <br />0.34 <br />$183.00 <br />Power Pole <br />002 <br />1 <br />$109.00 <br />Reseed Emergency Road to Power Pole with <br />REVEGE <br />0.80 <br />Grazing Land Mix <br />SUBTOTALS: <br />1.14 <br />$292 <br />INDIRECT COSTS <br />0.00 <br />OVERHEAD AND PROFIT: <br />Engineering work and/or contractibid preparation: <br />Liability insurance: <br />2.02 <br />Performance bond: <br />1.05 <br />Job superintendent: <br />0.57 <br />Profit: <br />10.00 <br />Total = $5.90 <br />Total = $3.07 <br />Total = $42.45 <br />Total = $29.20 <br />TOTAL O & P = $80.62 <br />CONTRACT AMOUNT (direct + O & P) = $372.62 <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT: <br />Financial warranty processing (legal/related costs): <br />0.00 <br />Total= 0.00 <br />Engineering work and/or contractibid preparation: <br />2.00 <br />Total = $7.45 <br />Reclamation management and/or administration: <br />1.91 <br />$7.12 <br />CONTINGENCY: <br />0.00 <br />Total = $0.00 <br />TOTAL INDIRECT COST = $95.19 <br />TOTAL BOND AMOUNT (direct + indirect) = $387.19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.