Laserfiche WebLink
EXISTING GROUND SURFACE <br /> EXISTING GROUND SURFACE <br /> Ada..,`[ "' ( a =.=i`Y• <br /> i„"° .. .:,,.•. SU WLSOILS — EXISTING <br /> 15' MAXIMUM SURFACE SEE DETAIL <br /> CAP NG <br /> EXISTING G <br /> ROUND <br /> ' +a, SEE DETAIL 6 RFACE <br /> v ,� -- - - -- 25' MAXIMUM SELECT Y <br /> SURD �� - UC:T(J r�� .'�.JO[v� SURFlC STRUCTURAL .: = SURFACE <br /> (� �-) (� .�� l SOILS . . FILL ��i i�_.t.. �� Y , <br /> -,✓-c a � ♦ SURFICIAL <br /> COMPETENT OR <br /> SOILS <br /> BEDROCK AS <br /> 7' MINIMUM `i , I"U/''�COMPACTED �" "'�" v. APPROVED "OV S> 'O< _---/ <br /> 1,� RY <br /> � CEMENTED U %� '•. BY ENGINEER 0 0 0!• -PLOWABLE FILL <br /> ROCK FILL /--F 0.5H 1V MINIMUM 4 v w;6s / -� BORDELEHOLE <br /> INTACT BEDROCK 50 MUM �0�� <br /> __- MAXI <br /> 1 ETE COMPETENT <br /> 3' MINIMUM CONCR .( BEDROCK AS 035 O O O <br /> PLUG APPROVED cff_ <br /> BY ENGINEER Qd: 00 ,._ - BLASTED CROWN PILLAR <br /> �`. OR O <br /> COARSE SHAFT <br /> EXISTING GROUND SURFACE C 5' TYP. <br /> BACKFILL 0 00 LOW COMPRESSIBILffY <br /> COMPACTED TOP LAYER '��sTr��.•.?f�.. �`.;7''T,^�C?�;""'�"'P9'•- " U� FLOWABLE FILL <br /> lam`¢". '.fv7 OPEN MINE J• G <br /> Cr s,�, ��r'`•`;.r,. ':r•^< LATERAL OR <br /> _ -- — '�� -`_t:'"'-.7"^.•-._ i�'.;"�'`.J.t;•{..:;':, INCLINE <br /> t:•C'q�:r.. ra :''R',�".:t, .^..,,.r.�'.�-,,.:;::i a` SURFlCIAL J G <br /> '•}•i t.;'� t' ;.2.:r•.,.4=yrhYr SOILS J0�o ov <br /> REMEDIATION NOTES: .ky;;` - :•�.. z. o <br /> 1. ROCK SURFACE WITHIN SHAFT SHALL BE SCALED TO REMOVE �••�5,. ,`iw,y.'•^' �� •K• -,?I yiY� <br /> LOOSE MATERIAL PRIOR TO CONCRETE PLUG AND CEMENTED �'+ 'N "•'. <br /> 25' MAX. ;.... STRUCTURAL'`'s , <br /> ROCKFlLL PLACEMENT. FILL <br /> Y' A 'j 2. CONTRACTOR TO CONSTRUCT 7' MINIMUM CEMENTED ROCKFlLL PRIOR TO REMEDIATION,; r^�,,.fY, rn.; ^;;}; :� POST REMEDIATION CONFIGURATION <br /> IN EITHER COMPETENT BEDROCK OR SURFICIAL SOILS. t ; 't•i' •c, <br /> .,.., .,�..•n l`-;`F:ice^:;y. <br /> 3. CONTRACTOR TO EXCAVATE PREVIOUSLY COLLAPSED w, ,,':;=..,:.-;;•`�,`,;1 g OPEN LATERAL REMEDIATION DETAIL <br /> SHAFTS/STOPES TO APPROXIMATELY 25' BELOW EXISTING <br /> GROUND. , , INTACT BEDROCK <br /> • — NTS <br /> 4. COMPACTION OF TOP LAYER OF COARSE SHAFT BACKFILL TO <br /> BE METHOD SPECIFICATION APPROVED BY THE ENGINEER. <br /> REMEDIATION NOTES: <br /> 1. COMPACT SELECT STRUCTURAL FILL USING METHOD <br /> SPECIFICATION APPROVED BY THE ENGINEER. EXISTING GROUND SURFACE <br /> 2. SELECT STRUCTURAL FILL MAY BE REPLACED WITH <br /> STRUCTURAL FILL PER THE PROJECT SPECIFICATIONS. <br /> 1 <br /> 1 SHAFT STOPE REMEDIATION DETAIL 2 SHALLOP SHAFT REMEDIATION DETAIL <br /> 6" MINIMUM SELECT STRUCTURAL FILL <br /> NTS NTS FIRST LAYER OF UX1700HS OR EQUIVALENT GEOGRID <br /> (INSTALLED APPROXIMATELY PARALLEL TO SLOPE DIRECTION) <br /> 6' MINIMUM SELECT STRUCTURAL FILL <br /> SECOND LAYER OF UX1700HS OR EQUIVALENT GEOGRID - - - <br /> (INSTALLED APPROXIMATELY PERPENDICULAR TO SLOPE DIRECTION) - <br /> - LAYER OF UX I'OOHS OR ECIUIVALENI GEOGRID f•• MINIMUM Sr;I.E�CT STRUi�T i1R.AL FILL <br /> .n•, <br /> ... ., ...., -.'... "., (,N .. w^ r___.v v _v._. x v ___v _.Y.-___-ri—•1l ...�...__y �........�A.... K _y.............�...... <br /> COMPACTED FOUNDATION MATERIAL <br /> REMEDIATION NOTES: <br /> 5 1. CONTRACTOR TO INSTALL DIRECTION OF MAXIMUM STRENGTH FOR THE SECOND LAYER OF UX1700HS OR EQUIVALENT HS <br /> EXISTING GROUND SURFACE GEOGRID TRANSVERSE TO THE DIRECTION OF MAXIMUM STRENGTH FOR THE FIRST LAYER OF UX1700HS GEOGRID. <br /> 2. A THIRD GEOGRID LAYER MAY BE ADDED IN AREAS UNDER HIGH NORMAL LOAD. AREAS REQUIRING THIRD GEOGRID WILL <br /> BE DETERMINED DURING REMEDIATION. <br /> 3. GEOGRID CAP TO EXTEND MINIMUM 15 FEET BEYOND MINE WORKING LIMIT. <br /> COARSE SHAFT BACKFILL <br /> OR STRUCTURAL FILL <br /> DEPENDING ON SLOT SIZE �QO �G 5 GEOGRID CAP INSTALLATION DETAIL (TYP.) <br /> ....... �� _ NTS <br /> 2' TO 3' TYPICAL .. . CLIENT CRIPPLE CREEK & VICTOR <br /> (NOT TO EXCEED 4FT.) .AO;;•, .( .��. PROJECT GOLD MINING COMPANY <br /> g ........ MILL SITE EARTHWORKS <br /> ¢ OPEN MINED SLOT REMEDIATION DETAIL `s70Np� TITLE <br /> NTS UNDERGROUND WORKING REMEDIATION <br /> 1 3/02/12 RE-ISSUED FOR CONSTRUCTION JNM <br /> JNM TYPICAL DETAILS <br /> 0 1/24/12 ISSUED FOR CONSTRUCTION JNM <br /> CM7 <br /> DISCLAIMER DESIGNED BY CMT CHECKED BY JNM <br /> AMEC PRODUCED THE INFORMATION PRESENTED ON THIS DRAWING THROUGH THE <br /> USE OF TECHNICAL INFORMATION AND PRACTICAL EXPERIENCE SPECIFIC TO ITS DRAWN BY CMT APPROVED BY JNM <br /> EFiORTS.RECEIVING THIS DRAWING DOES NOT GUARANTEE ANY RIGHTS TO SUCH <br /> TECHNICAL INFORMATION AND PRACTICAL EXPERIENCE.ANY ALTERATION OR rRAWING <br /> SOLE RSKNAND WITHOUTAANY LIABILITY OR ORFLEGAL RESPONSIBILITY TO AMECSER'S ame 74201125KD05 A45 c R1 <br />