Trapper Mining Inc., TR -115 <br />Page 12 <br />to monitor movement as requested by the Trapper Mine MSHA ground control plan and the <br />Division. Currently the ground control plan has been updated and no longer requires this <br />monitoring and nearly all the monitoring stations have been removed as a result of mining <br />progression. Trapper also requests the discontinuation of the semi-annual reporting requirement <br />of slide monitoring to the Division. <br />Page 3-28 updated to reflect new PR -07 permit boundary. Pre -blast surveys are included <br />corresponding with this updated list. Pages 3-182 and 3-183 are updated with new information <br />pertaining to facilities on the site. Currently a new building for blasting vehicle and equipment <br />storage is being constructed just north of the East A -Pit road near Middle Flume pond. New <br />Appendix A material has also been included to revise our bond estimate for demolition of this <br />building. Revisions have also been made to maps M -13A, M -13C for facilities updates regarding <br />the blasting building and Map M9 to revise proposed haulroad construction timeframes and <br />routes. <br />Pages 4-242, 2-444, 4-245, 4-247a are updated to add three new monitoring wells drilled on the <br />eastern edge of the mine site in the new PR -07 extended permit area. Wells GLEV-1, GLEV-2 <br />and GLEV-3 were completed to fulfill baseline and continued monitoring of the eastern part of <br />the mine and possible expansion areas east of the wells. They are being monitored on the same <br />frequency as the other established wells on the site and will be included in the 2015 Annual <br />Hydrology Report. Trapper also proposes the discontinuation of monitoring and abandonment of <br />well P-3 in Pyeatt Gulch. It was discovered that at some time in the recent past the well bore <br />itself appeared to have either collapsed or sheared. The full depth of the well can no longer be <br />reached and is no longer useful for monitoring. The well is completed in the Lewis Shale just <br />north of the current permit boundary in Pyeatt Gulch. That particular geologic strata was not <br />directly disturbed by mining at Trapper, and will not be in the future. Well P-1 is completed in <br />the shallow alluvium deposits of Pyeatt Gulch just west of P-3. Historically these two wells have <br />demonstrated similar static water levels and water quality. Further data from well P-3 is no <br />longer necessary and it would be impractical to re-establish the well at this point in time. <br />The post mining topography proposed and approved with PR -06 has been revised for the K Strike <br />Pit area in order to achieve a more natural landscape and improve drainage features and design in <br />the regraded spoils. Map M12 has been revised to reflect these changes. Also small changes in <br />the ash disposal area and future PMT corrections are included on Maps M12 and M47a. Revised <br />materials for Appendix T are also included to incorporate new diversion ditch designs for the <br />northeast side of the horse gulch fill. The revised PMT will use several smaller and shorter <br />containment ditches to segregate drainage from the fill and regraded spoils and direct it to <br />designed drainages. <br />The limits of topsoil stripping have been revised on Map M10B to reflect the proposed stripping <br />in 2016 and 2017 to the south and eastern side of L Dip Pit. The newly proposed stripping limits <br />will include 49.7 additional acres of disturbance beyond the approved PR -07 disturbance. <br />