My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-03-02_GENERAL DOCUMENTS - C1981044
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981044
>
2016-03-02_GENERAL DOCUMENTS - C1981044
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/29/2017 9:00:51 AM
Creation date
3/3/2016 12:47:37 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981044
IBM Index Class Name
General Documents
Doc Date
3/2/2016
Doc Name
MT7
From
DRMS
To
Moffat County Mining, LLC
Annual Report Year
2016
Permit Index Doc Type
Findings
Email Name
TNL
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
164
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Demo Worksheet Cont'd Task # TTT Page 38 of 151 <br />Cycle Time: <br />Scraper Loading Time: 1.00 Minutes <br />Maneuver and Spread Time: 0.60 Minutes <br />Job Condition Correction: Site Altitude: 5400 feet <br />Net Correction: 0.830 NA <br />Travel Time: <br />Road Condition: Rutted dirt, little maintenance, no water, 2" tire penetration 5.0 <br />Haul Route: <br />Seg # <br />Haul Distance (Ft) <br />Grade <br />Roll. Res <br />Scraper Push Dozer Source <br />Altitude Adj: <br />1.000 NA (CAT HB) <br />Job Efficiency: <br />0.830 NA (CAT HB) <br />Net Correction: 0.830 NA <br />Travel Time: <br />Road Condition: Rutted dirt, little maintenance, no water, 2" tire penetration 5.0 <br />Haul Route: <br />Seg # <br />Haul Distance (Ft) <br />Grade <br />Roll. Res <br />Total Res <br />Velocity <br />(fpm) <br />Travel Time <br />(min) <br />1 <br />1400.00 <br />-2.50 <br />5.00 <br />2.50 <br />2939 <br />0.76 <br />Haul Time: 0.76 minutes <br />Return Route: <br />Seg # <br />Haul Distance (Ft) <br />Grade <br />Roll. Res <br />Total Res <br />Velocity <br />(fpm) <br />Travel Time <br />(min) <br />1 <br />1400.00 <br />2.50 <br />5.00 <br />7.50 <br />1931 <br />0.81 <br />Return Time: <br />Total Scraper team cycle time: <br />Adjusted for job conditions: <br />Selected Number of Scrapers: <br />Adjusted single scraper team (unit) hourly production: <br />Adjusted multiple scraper team (fleet) hourly production: <br />Unadjusted unit production/hour: 1,097.79 LCY/Hour <br />Optimal Number of Scrapers per push <br />dozer: <br />JOB TIME AND COST <br />0.81 minutes <br />3.17 <br />minutes <br />911.17 <br />LCY/Hour <br />2 <br />Scraper(s) <br />911.17 <br />LCY/Hour <br />911.17 <br />LCY/Hour <br />Fleet size: 1 Team(s) Total job time: 43.48 Hours <br />Unit cost: $0.870 /LCY Total job cost: $34,452 <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.