Laserfiche WebLink
Cost Summary Worksheet Cont'd <br />Visibility: <br />Job efficiency: <br />Spoil pile: <br />Push gradient: <br />Altitude: <br />Material Weight: <br />Blade type: <br />1.000 <br />(AVG.) <br />0.830 <br />(1 SHIFT/DAY) <br />0.800 <br />(FND-RF) <br />1.115 <br />(CAT HB) <br />1.000 <br />(CAT HB) <br />0.793 <br />(CAT HB) <br />1.000 <br />(PAT) <br />Net correction: 0.3963 <br />Adjusted unit production: 554.82 LCY/hr <br />Adjusted fleet production: 554.82 LCY/hr <br />JOB TIME AND COST <br />Fleet size: 1 Dozer(s) <br />Unit cost: $0.374/LCY <br />Total job time <br />Total job cost <br />2.33 Hours <br />$484.20 <br />Page 14 of 22 <br />CIRCES Cost Estimating Software <br />