Laserfiche WebLink
Cost Summary Worksheet Cont'd Task # 000 Page 4 of 7 <br />Task description: <br />Site: New Horizon Mine <br />BULLDOZER WORK <br />Collection Ditch at Tailwater <br />Permit Action: TR70 <br />PROJECT IDENTIFICATION <br />Task #: 002 State: <br />Date: 2/26/2016 County: <br />User: JDM <br />Colorado <br />Montrose <br />Pere- tWob#: C1981008 <br />Abbreviation: None <br />Filename: C008-002 <br />Agency or organization name: Colorado Division of Reclamation, Mining and Safety <br />HOURLY EQUIPMENT COST <br />Basic Machine: Cat D3K XL - 3P <br />Horsepower: 74 <br />Blade Type: Power Angle Tilt <br />Attachment: 3 -shank ripper <br />Shift Basis: 1 per day <br />Data Source: (CRG) <br />Cost Breakdown: <br />Utilization % <br />Ownership Cost/Hour: <br />$10.02 <br />NA <br />Operating Cost/Hour: <br />$26.61 <br />100 <br />Ripper op. Cost/Hour: <br />$0.00 <br />100 <br />Operator Cost/Hour: <br />$38.89 <br />NA <br />Total unit Cost/Hour: 0 <br />Total Fleet Cost/Hour: $75.52 <br />MATERIAL QUANTITIES <br />Initial Volume: 2,561 <br />Swell factor: 1.165 <br />Loose volume: 2,984 LCY <br />Source of estimated volume: Length from map 2.05.3-1, X -sec from Sec 2.05.3 <br />Source of estimated swell Cat Handbook <br />factor: <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly <br />production: <br />50 feet <br />169.6 LCY/hr <br />Materials consistency description: Consolidated <br />Average push <br />gradient: <br />Average site altitude: <br />Material weight: <br />0% <br />5,700 feet <br />2.900 lbs/LCY <br />Weight description: Decomposed rock - 50% <br />Job Condition Correction Factor <br />Operator Skill: 0.750 <br />1.0 <br />50% Earth <br />Source <br />AVG.) <br />CIRCES Cost Estimating Software <br />