Laserfiche WebLink
Cost Summary Worksheet Cont'd Task # 000 Page 2 of 7 <br />Task description: <br />Site: New Horizon Mine <br />BULLDOZER WORK <br />Pond 016 <br />Permit Action: TR70 <br />PROJECT IDENTIFICATION <br />Task #: 001 State: <br />Date: 2/26/2016 County: <br />User: JDM <br />Colorado <br />Montrose <br />Pere- tWob#: C1981008 <br />Abbreviation: None <br />Filename: C008-001 <br />Agency or organization name: Colorado Division of Reclamation, Mining and Safety <br />HOURLY EQUIPMENT COST <br />Basic Machine: <br />Cat D9T - 9SU <br />Horsepower: <br />405 <br />Blade Type: <br />Semi -Universal <br />Attachment: <br />NA <br />Shift Basis: <br />1 per day <br />Data Source: <br />(CRG) <br />Cost Breakdown: <br />NA <br />Materials consistency description: Compacted fill or embankment 0.9 <br />Average push <br />gradient: <br />Average site altitude: <br />Material weight: <br />0% <br />5.700 feet <br />lbs/LCY <br />Weight description: Decomposed rock - 50% <br />Job Condition Correction Factor <br />Operator Skill: 0.750 <br />50% Earth <br />Source <br />AVG.) <br />CIRCES Cost Estimating Software <br />Utilization % <br />Ownership Cost/Hour: <br />$75.12 <br />NA <br />Operating Cost/Hour: <br />$135.36 <br />100 <br />Ripper op. Cost/Hour: <br />$0.00 <br />0 <br />Operator Cost/Hour: <br />$38.89 <br />NA <br />Total unit Cost/Hour: $249.37 <br />Total Fleet Cost/Hour: $249.37 <br />MATERIAL QUANTITIES <br />Initial Volume: 20,000 <br />Swell factor: 1.165 <br />Loose volume: 23,300 LCY <br />Source of estimated volume: <br />Attch 2.05.3(3)-29 Map 2 <br />Source of estimated swell <br />Cat Handbook <br />factor: <br />HOURLY PRODUCTION <br />Average push distance: <br />100 feet <br />Unadjusted hourly <br />1,243.2 LCY/hr <br />production: <br />Materials consistency description: Compacted fill or embankment 0.9 <br />Average push <br />gradient: <br />Average site altitude: <br />Material weight: <br />0% <br />5.700 feet <br />lbs/LCY <br />Weight description: Decomposed rock - 50% <br />Job Condition Correction Factor <br />Operator Skill: 0.750 <br />50% Earth <br />Source <br />AVG.) <br />CIRCES Cost Estimating Software <br />