My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-03-01_REVISION - C1981008 (19)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981008
>
2016-03-01_REVISION - C1981008 (19)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:19:49 PM
Creation date
3/3/2016 9:48:59 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981008
IBM Index Class Name
Revision
Doc Date
3/1/2016
Doc Name
Adequacy Review & Cost Estimate
From
DRMS
To
Tri-State Generation and Transmission Association, Inc
Type & Sequence
TR70
Email Name
BFB
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Cost Summary Worksheet Cont'd Task # 000 Page 7 of 7 <br />Cycle Time: <br />Scraper Loading Time: <br />Maneuver and Spread Time: <br />Job Condition Correction: <br />0.60 Minutes <br />0.70 Minutes <br />Site Altitude: 5700 feet <br />Net Correction: 0.830 0.830 <br />Travel Time: <br />Road Condition: Firm, smooth, rolling, dirt/It. surfaced, watered, maintained 3.0 <br />Haul Route: <br />Seg # <br />Scraper <br />Push Dozer <br />Source <br />Altitude Adj: <br />1.000 <br />1.000 <br />(CAT HB) <br />Job Efficiency: <br />0.830 <br />0.830 <br />(CAT HB) <br />Site Altitude: 5700 feet <br />Net Correction: 0.830 0.830 <br />Travel Time: <br />Road Condition: Firm, smooth, rolling, dirt/It. surfaced, watered, maintained 3.0 <br />Haul Route: <br />Seg # <br />Haul Distance (Ft) <br />Grade <br />Roll. Res <br />Total Res <br />% <br />Velocity <br />(fpm) <br />Travel Time <br />(min) <br />1 <br />200.00 <br />0.00 <br />3.00 <br />3.00 <br />2227 <br />0.34 <br />Haul Time: 0.34 minutes <br />Return Route: <br />Seg # <br />Haul Distance (Ft) <br />Grade <br />Roll. Res <br />Total Res Velocity <br />(fpm) <br />Travel Time <br />(min) <br />1 <br />200.00 <br />0.00 <br />3.00 <br />3.00 2890 <br />0.30 <br />Return Time: <br />0.30 <br />minutes <br />Total Scraper team cycle time: <br />1.94 <br />minutes <br />Adjusted for job conditions: <br />744.43 <br />LCY/Hour <br />Selected Number of Scrapers: <br />2 <br />Scraper(s) <br />Adjusted single scraper team (unit) hourly production: <br />1,488.87 <br />LCY/Hour <br />Adjusted multiple scraper team (fleet) hourly production: <br />1,488.87 <br />LCY/Hour <br />Unadjusted unit production/hour: 896.91 LCY/Hour <br />Optimal Number of Scrapers per push dozer: <br />JOB TIME AND COST <br />Fleet size: 1 Team(s) Total job time: 3.69 Hours <br />Unit cost: $0.548 /LCY Total job cost: $3,008 <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.