Laserfiche WebLink
rslk.j COLORADO DIVISION OF RECLAMATION, MINING AND SAFETY <br /> �kf <br /> 1313 Sherman Street,Room 215,Denver,Colorado 80203 ph(303)866-3567 <br /> REQUEST FOR TECHNICAL REVISION (TR) COVER SHEEIR11h GCF: . <br /> File No.: M- 1999-021 site Name:Stegner Farms MAR u i 2016 <br /> County La ri m e r �IVISION Of r <br /> - - - -- TR# W v y <br /> Trollco, Inc. <br /> Permittee: ,. <br /> __-- TTR06 <br /> Operator(If Other than Permittee): C'Ompl[ed t - - <br /> Permittee Representative: Cody Wooldridge ✓0 violations <br /> Please provide a brief description of the proposed revision: <br /> We would like to create one larger lake with a couple of small islands for wildlife habitat rather than splitting it into <br /> two lakes.We want to leave the temporary berms around the west and north sides and actually construct <br /> additional berms to connect them all together. The alternative plan is to construct various fish hatchery ponds at <br /> the east end of property. This project is very preliminary and will require more specific plans in the near future. <br /> As defined by the Minerals Rules, a Technical Revision (TR) is: "a change in the permit or application <br /> which does not have more than a minor effect upon the approved or proposed Reclamation or <br /> Environmental Protection Plan." The Division is charged with determining if the revision as submitted <br /> meets this definition. If the Division determines that the proposed revision is beyond the scope of a TR, <br /> the Division may require the submittal of a permit amendment to make the required or desired changes <br /> to the permit. <br /> The request for a TR is not considered"filed for review" until the appropriate fee is received by the <br /> Division (as listed below by permit type). Please submit the appropriate fee with your request to <br /> expedite the review process. After the TR is submitted with the appropriate fee, the Division will <br /> determine if it is approvable within 30 days. If the Division reuuires additional information to approve a <br /> TR, you will be notified of specific deficiencies that will nee" be a If at the end of the 30 <br /> r re�� w period there are *�" to i .: ;-,.-ision : y the TP unless the <br /> pc�u��. 4 .:,.fits,,�a1 time, in writing, to provide the required inform..,;_�n. ._, P. <br /> There is no pre-defined format for the submittal of a TR; however, it is up to the permittee to pro v ide <br /> sufficient information to the Division to approve the TR request, including updated mining and <br /> reclamation plan maps that accurately depict the changes proposed in the requested TR. <br /> Required Fees for Technical Revision by Permit Type-.Please mark the correct fee and submit it with <br /> your request for a Technical Revision. <br /> Permit Tyne Required 'UR Fee Submitted (mark only one) <br /> l IOc, 1 11, 112 construction ❑ <br /> materials,and 112 quarries $216 <br /> 112 hard rock(not DMO) $175 ❑ <br /> l I Od, 1 12d(1, 2 or 3) $1006 ❑ <br />