Laserfiche WebLink
February 25, 2016 C-1981-028/Keenesburg Strip Mine TNL <br />Inspection Topic Summary <br />NOTE: Y=Inspected N=Not Inspected R=Comments Noted V=Violation Issued NA=Not Applicable <br />Y - Air Resource Protection <br />N - Availability of Records <br />R - Backfill & Grading <br />N - Excess Spoil and Dev. Waste <br />NA - Explosives <br />Y - Fish & Wildlife <br />R - Hydrologic Balance <br />Y - Gen. Compliance With Mine Plan <br />N - Other <br />N - Processing Waste <br />R - Roads <br />N - Reclamation Success <br />N - Revegetation <br />NA - Subsidence <br />NA - Slides and Other Damage <br />N - Support Facilities On-site <br />Y -Signs and Markers <br />NA - Support Facilities Not On-site <br />N - Special Categories Of Mining <br />Y -Topsoil <br />COMMENTS <br />A partial inspection of the Keenesburg Mine, C-1981-028, operated by Coors Energy Company was conducted on <br />25 February, 2016 by Tabetha Lynch of the Division of Reclamation, Mining and Safety. The weather was clear <br />and sunny. The mine was mostly dry and accessible. Snow had melted off at the time of inspection. Danny Kipp <br />with CEC was present during the inspection. <br />BACKFILL and GRADING — Rule 4.14 <br />Contemporaneous Reclamation 4.14.1; Approximate Original Contour 4.14.2; Highwall Elimination 4.14.1(2)(f); <br />Steep Slopes 4.14.2, 4.27; Handling of Acid and Toxic Materials 4.14.3; Stabilization of Rills and Gullies 4.14.6: <br />Ash backfill in B -pit is shown in the photos below. B -Pit appears stable and well maintained. Four loads <br />of ash were delivered the morning prior to the inspection. <br />HYDROLOGIC BALANCE -Rule 4.05 <br />Drainage Control 4.05.1, 4.05.2, 4.05.3; Siltation Structures 4.05.5, 4.05.6; Discharge Structures 4.05.7, 4.05.10; <br />Diversions 4.05.4; Effluent Limits 4.05.2; Ground Water Monitoring 4.05.13; Surface Water Monitoring 4.05.13; <br />Drainage — Acid and Toxic Materials 4.05.8; Impoundments 4.05.6, 4.05.9; Stream Buffer Zones 4.05.18: <br />Sediment Pond No. 2 was holding snow melt water. The banks appeared stable. Water level marker was <br />in place. The dugout pond was also holding snow melt The north perimeter ditch appeared clear. There was water <br />present in B -pit (photo). <br />ROADS — Rule 4.03 <br />Construction 4.03.1(3)/4.03.2(3) <br />Drainage 4.03.1(4)/4.03.2(4) <br />Surfacing and Maintenance4.03.1(5) and (6)/4.03.2(5) and (6) <br />Reclamation 4.03.1(7)/4.03.2(7): <br />Roads were in good condition. <br />Number of Partial Inspection this Fiscal Year: 7 <br />Number of Complete Inspections this Fiscal Year: 2 <br />Page 2 of 4 <br />