TABLES AND FIGURES
<br />Table 1. Summary of All Liability Releases (acres)
<br />Table 2. Summary of All Bond Release Dollars
<br />Action
<br />Total Disturbed
<br />Phase I Released
<br />Phase II Released Phase III Released
<br />Phase III Released
<br />Permitted
<br />5,214.8
<br />SL -01
<br />$ 19,581,899.00
<br />SL -01
<br />$ 857,342.00
<br />226.4
<br />176.4
<br />SL -02
<br />$ 0.00
<br />712.1
<br />$ 0.00
<br />SL -03
<br />$ 14,102,823.00
<br />$ 0.00
<br />762.1
<br />SL -04
<br />2010 Midterm
<br />494.2
<br />420.9
<br />SL -05
<br />$ 0.00
<br />SL -04
<br />979.5
<br />SL -06
<br />$ 2,585,974.00
<br />692.4
<br />SL -05
<br />SL -07
<br />$ 0.00
<br />125.2
<br />$ 692,320.00
<br />SL -08
<br />$ 78,052,169.00
<br />189.6
<br />$ 0.00
<br />$ 0.00
<br />SL -07
<br />$ 80,517,829.00
<br />$ 727,269.00
<br />Totals
<br />5,214.8
<br />2,439.9
<br />1,359.4 979.5
<br />Table 2. Summary of All Bond Release Dollars
<br />Action
<br />Liability*
<br />Phase I Released
<br />Phase II Released
<br />Phase III Released
<br />SL -01
<br />$ 19,581,899.00
<br />$ 0.00
<br />$ 857,342.00
<br />$ 0.00
<br />SL -02
<br />$ 15,670,521.00
<br />$ 0.00
<br />$ 0.00
<br />$ 0.00
<br />SL -03
<br />$ 14,102,823.00
<br />$ 0.00
<br />$ 0.00
<br />$ 0.00
<br />2010 Midterm
<br />$ 83,156,939.00
<br />$ 0.00
<br />$ 0.00
<br />$ 0.00
<br />SL -04
<br />$ 80,570,965.00
<br />$ 0.00
<br />$ 2,585,974.00
<br />$ 0.00
<br />SL -05
<br />$ 68,825,509.00
<br />$ 0.00
<br />$ 0.00
<br />$ 692,320.00
<br />SL -06
<br />$ 78,052,169.00
<br />$ 2,465,660.00
<br />$ 0.00
<br />$ 0.00
<br />SL -07
<br />$ 80,517,829.00
<br />$ 727,269.00
<br />$ 0.00
<br />$ 0.00
<br />SL -08
<br />$ 77,073,267.00
<br />$ 3,444,562.00
<br />$ 0.00
<br />$ 0.00
<br />Totals
<br />N/A
<br />$ 6,637,491.00
<br />$ 3,443,316.00
<br />$ 692,320.00
<br />*Liability amount may not correlate from one SL to another due to other revisions being approved in the interim
<br />Table 3. Specifications for Drainage Ditches
<br />Ditch Bottom width (ft) Depth (ft) Side slope Riprap D50
<br />(inches)
<br />West Pit Fill Ditch > 10 >2 3:1 12" - 24"
<br />Gulch A Ditch > 10 >2.5 3:1 9" - 15"
<br />Proposed Decision and Findings of Compliance January 2016
<br />Partial Phase I Bond Release SL -08 Page 9