Laserfiche WebLink
3/1/2016 <br />State.co.us Executive Branch Mail - Fwd: Fresh water pipeline corridor <br />STATE, OF Hernandez - DNR Alysha <alysha.hernandez@state.co.us> <br />� �O L, R�'AI O ' <br />Please file under SL -04. Thanks. <br />---------- Forwarded message ---------- <br />From: WD & Andrea Corley Jr. <ajjc@att.net> <br />Date: Sun, Feb 28, 2016 at 3:22 PM <br />Subject: Fresh water pipeline corridor <br />To: rob.zuber@state.co.us <br />Cc: alweaverefci@gmaii.com <br />Rob, <br />One comment about the Feb. 24th inspection report: the EFCI Southfield map titled Mine Area Surface and <br />Groundwater Hydrology, revision 12, clearly shows the rill in the fresh water pipeline corridor to be within the <br />Southfield disturbed area depicted as a solid line denoting surface disturbance. <br />Doug <br />https://mail.googl e.com/m ai I/u/0/?ui=2&i k=e29129fcb5&view=pt&search= i nbox&th=153323d7c6l2a474&si m l=153323d7c6l2a474 1 /1 <br />