Laserfiche WebLink
Jessica Loveland <br />Page 2 <br />February 29, 2016 <br />A. As previously discussed, please resubmit the 2015 ARR with a revised value for Acres <br />disturbed and a revised version of Table I when the actual disturbance at pads 1-4 has <br />been surveyed. <br />B. When the form is re -submitted, please include copies of the seed invoices. <br />C. When the form is re -submitted, please also address an apparent contradiction, (which is <br />likely due to the complicated layout of the form itself): The Cumulative Total value for <br />Acres disturbed is reported as the same as that for the Entire Life of Mine (515.43). These <br />two values would be the same if no disturbed land had received Phase III bond release — <br />that is not true for the West Elk Mine, where 24.2 acres has been Phase III released. <br />D. In the attached Table II the fourth column is labelled as "2015 Photo Reclamation Report <br />Page Number". What does this refer to? <br />Finally, the 2016 ARR is due by February 15, 2017. Please plan to include details of any weed or <br />erosion control, re -seeding or vegetation sampling that takes place in 2016. <br />Sincerely, <br />Leigh Simmons <br />Environmental Protection Specialist <br />CC: Kathy Welt <br />