My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-02-29_REVISION - C1981019 (4)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981019
>
2016-02-29_REVISION - C1981019 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:19:45 PM
Creation date
2/29/2016 1:12:11 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
Revision
Doc Date
2/29/2016
Doc Name
Adequacy Review
From
Tri-State Generation and Tranmsmission Association, Inc
To
DRMS
Type & Sequence
PR4
Email Name
ZTT
JRS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 <br />Mr. Zach Trujillo <br />February 24, 2016 <br />Page 5 <br />The text on page Exh. 7-231-3, last paragraph, mentions "seven " stock ponds. This should likely read <br />"six " stock ponds instead. <br />Response: Page Exh. 7-23I-3, last paragraph, has been updated to the correct value of "six" as requested. <br />ITEM 46. Response is adequate. <br />ITEM 47. Response is adequate. <br />ITEM 48. The Division still believes that the sentence would be clearer if it read, "These points include <br />five locations along Good Spring Creek and its tributaries... " However, this is a very small comment <br />and, at this point, merely a suggestion. <br />Response: No further response required. <br />ITEM 49. Response is adequate. <br />ITEM 50. Response is adequate. <br />ITEM 51. Response is adequate. <br />ITEM 52. Response is adequate. <br />ITEM 53. Response is adequate. <br />ITEM 54. Response is adequate. <br />Additional Items - General <br />ITEM 55. It appears that some revisions from recent MRs were not placed in the overlapping revised <br />pages for PR -04. For example, the substations on Map 22A (added with MR -142) are not shown on the <br />proposed version of this map. Please address this omission and check that there are no other <br />omissions related to MRs (in particular, MRs 141-147). <br />Response: Approved materials for MR -142, MR -144, MR -145, and MR -146 have been included into <br />PR -04 and submitted here within. Materials for approved MR -150 have also been included as they <br />supersede materials approved under MR -143. The enclosed index sheet indicates specific materials that <br />have been updated in regards to each individual minor revision. Materials approved under MR -141, MR - <br />147, MR -148, and MR -149 have not been included as those approved materials did not overlap with <br />application materials included in PR -04. <br />ITEM 56. Response is adequate. <br />ITEM 57. Response is adequate. <br />AM EQUAL OPPORTUNITY/AFFIRMATIVE ACTION EMPLOYED <br />A Touchstone Energy*Cooperative <br />v. <br />
The URL can be used to link to this page
Your browser does not support the video tag.