Laserfiche WebLink
Colowyo Coal Company L.P. <br />III. Summary of Reclamation and Management <br />As shown on Exhibit 1, the area requested for bond release is comprised of one <br />reclamation unit that was regraded topsoiled and seeded in 2015. The work completed <br />includes regrading to the approved post -mining topography and installation of post - <br />mining drainage channels and post -mine stock ponds in required areas. Grading and <br />topsoil replacement is generally performed in the summer and fall months. <br />The reclaimed area has been regraded consistent with the approved post -mining <br />topography (See Map 19 and 19A, Permit C-1981-019 for the approved post -mining <br />topography), and follows all criteria set forth for Phase I bond release by the Division. <br />Please refer to Exhibit 2 for two (2) representative cross-sections of the regraded area in <br />relation to the approved post -mining topography. <br />Permanent post -mine channel segments and post -mine stock ponds have been established <br />in the Phase I area in accordance with the approved construction design parameters <br />located in Permit C-1981-019. These reconstructed channel segments and stock ponds are <br />not being applied for release under this application as the entire watershed reporting to <br />these structures has not been reclaimed to date. <br />SL -09 Phase I Bond Release Application Page 8 <br />