Laserfiche WebLink
Cost Summary Worksheet Cont'd <br />Material consistency: <br />1.000 <br />Dozing method: <br />1.000 <br />Visibility: <br />1.000 <br />Job efficiency: <br />0.830 <br />Spoil pile: <br />0.600 <br />Push gradient: <br />1.000 <br />Altitude: <br />1.000 <br />Material Weight: <br />0.793 <br />Blade type: <br />1.000 <br />Net correction: 0.2962 <br />Adjusted unit 50.24 LCY/hr <br />production: <br />Adjusted fleet 50.24 LCY/hr <br />production: <br />JOB TIME AND COST <br />Fleet size: 1 Dozer(s) <br />Unit cost: $1.503/LCY <br />Total job time: 59.39 Hours <br />Total job cost: $4,485 <br />Task # 000 <br />(CAT HB) <br />(GEN.) <br />(AVG.) <br />(1 SHIFT/DAY) <br />(FND-SF) <br />(CAT HB) <br />(CAT HB) <br />(CAT HB) <br />Page 5 of 7 <br />CIRCES Cost Estimating Software <br />