My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-02-26_REVISION - C1981008 (10)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981008
>
2016-02-26_REVISION - C1981008 (10)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:19:34 PM
Creation date
2/29/2016 7:21:03 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981008
IBM Index Class Name
Revision
Doc Date
2/26/2016
Doc Name
Adequacy Review Memo and RCE
From
Jason Musick
To
Brock Bowles
Type & Sequence
TR70
Email Name
BFB
DIH
JDM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Task description: <br />Site: New Horizon Mine <br />PROJECT IDENTIFICATION <br />COST SUMMARY WORK <br />of TR -70 Tasks <br />Permit Action: TR70 <br />Task #: 000 State: Colorado <br />Date: 2/26/2016 County: Montrose <br />User: JDM <br />Agency or organization name: DRMS <br />TASK LIST (DIRECT COSTS) <br />Permit/Job#: C1981008 <br />Abbreviation: None <br />Filename: C008-000 <br />Task <br />Description <br />Form <br />Used <br />Fleet <br />Size <br />Task <br />Hours <br />Cost <br />001 <br />002 <br />003 <br />Regrade Pond 016 <br />DOZER <br />1 <br />1 <br />1 <br />52.74 <br />$13,151.00 <br />$4,485.00 <br />$3,008.00 <br />Regrade Collection Ditch at Tailwater <br />DOZER <br />59.39 <br />Replace topsoil on Pond 016 <br />SCRAPERI <br />3.69 <br />SUBTOTALS: <br />115.82 <br />$20,644 <br />INDIRECT COSTS <br />0.00 <br />OVERHEAD AND PROFIT: <br />Engineering work and/or contract/bid preparation: <br />Liability insurance: <br />2.02 <br />Performance bond: <br />1.05 <br />Job superintendent: <br />57.91 <br />Profit: <br />10.00 <br />Total = $417.01 <br />Total = $216.76 <br />Total = $4,313.14 <br />Total = $2,064.40 <br />TOTAL O & P = $7,011.31 <br />CONTRACT AMOUNT (direct + O & P) = $27,655.31 <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT: <br />Financial warranty processing (legal/related costs): <br />0.00 <br />Total = 0.00 <br />Engineering work and/or contract/bid preparation: <br />4.61 <br />Total = $1,274.91 <br />Reclamation management and/or administration: <br />3.58 <br />$990.06 <br />CONTINGENCY: <br />0.00 <br />Total = $0.00 <br />TOTAL INDIRECT COST = $9,276.28 <br />TOTAL BOND AMOUNT (direct + indirect) = $29,920.28 <br />
The URL can be used to link to this page
Your browser does not support the video tag.