Laserfiche WebLink
February 23, 2016 C-1981-038/Bowie No. 1 Mine JDM <br /> <br /> <br />Number of Partial Inspection this Fiscal Year: 6 <br />Number of Complete Inspections this Fiscal Year: 2 <br /> <br /> Page 3 of 4 <br /> <br /> <br />All ditches and culverts at the East Mine designed to convey run-off from the reclaimed slopes to the ponds were <br />partially snow covered with no problems noted. The rock lined channel on the west side of the refuse disposal <br />area was partially snow covered and stable. <br /> <br />Ponds 1, 2, 3, and 4 and Ponds W-1, W-2, the Timber Storage Pond, and the West Ridge Pond were partially snow <br />covered and stable with no problems noted. <br /> <br />ROADS – Rule 4.03 Construction 4.03.1(3)/4.03.2(3) Drainage 4.03.1(4)/4.03.2(4) Surfacing and Maintenance <br />4.03.1(5) and (6)/4.03.2(5) and (6) Reclamation 4.03.1(7)/4.03.2(7): <br /> <br />The East Mine Haul Road has been narrowed to the current configuration. All surface drainage is directed to the <br />roadside ditch on the uphill side of the road by water bars. The haul road was covered with a heavy snow and <br />inaccessible, no problems were noted and no evidence of recent use was noted. <br /> <br />All roads associated with the East Mine were snow covered, stable, and inaccessible during the inspection with no <br />problems noted. <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />