Laserfiche WebLink
February 23, 2016 C-1983-059/Terror Creek Loadout JDM <br />The haul road ditches and lower yard ditches were clear at the time of the inspection with no problems noted. <br />ROADS — Rule 4.03 Construction 4.03.1(3)/4.03.2(3) Drainage 4.03.1(4)/4.03.2(4) Surfacing and Maintenance <br />4.03.1(5) and (6)/4.03.2(5) and (6) Reclamation 4.03.1(7)/4.03.2(7): <br />The access road to the site was stable with no problems noted and no evidence of recent use. The main access gate <br />at the entrance of the road off of the Bowie Rd. was locked. No problems were noted. <br />SUPPORT FACILITIES - Rule 4.04, 4.28.- <br />Facilities <br />.28: <br />Facilities remaining on-site are the concrete pad from the shop and the office. A portion of the crushing and <br />screening plant and the truck scale and scale house remain on site. Footers and wing walls remain. <br />The site was idle with no activity noted since the January 2016 partial inspection. <br />Concrete pad and footers <br />Number of Partial Inspection this Fiscal Year: 6 <br />Number of Complete Inspections this Fiscal Year: 2 <br />Page 3 of 4 <br />