COLORADO <br />Division of Reclamation, <br />Mining( and Safety <br />Department of Natural Resources <br />1313 Sherman Street, Room 215 <br />Denver, CO 80203 <br />February 24, 2016 <br />Brian Watterson, P.G. <br />Twentymile Coal Company <br />29515 Rout County Road #27 <br />Oak Creek, CO 80467 <br />RE: Foidel Creek Mine; C-1982-056 <br />Twentymile Mine Exploration Drill Hole Abandonment Report Review <br />Dear Mr. Watterson: <br />The Colorado Division of Reclamation, Mining, and Safety (Division), received a drill hole abandonment <br />report for the majority of the Wolf Creek Reserve corehole project on July 8, 2015. However, several of <br />the coreholes drilled and sealed with the Wolf Creek Reserve Corehole project were not included in the <br />abandonment report. This issue was cited as a maintenance item on the Division's site inspection reports. <br />The Division requested abandonment reports for the following drill holes: WC -026E, WC -026F, WC - <br />026G, WC -027, WC -029, WC -2613, WC -028 and WC -006. <br />On February 10, 2016 during the Division's site inspection, you provided me a spreadsheet with the drill <br />hole abandonment information for the drill holes in question with the exception of WC -006. According <br />to Mike Berdine, this hole was never drilled. However, when the Division visited the WC -006 site during <br />the August 11, 2015 site inspection, the area had been disturbed but was reclaimed. A drill hole was not <br />observed but an identification marker was in place. The drill hole abandonment spreadsheet provided was <br />reviewed for compliance with Rule 4.07.3 of the Regulations of the Colorado Mined Land Reclamation <br />Board for Coal Mining. The spreadsheet contains all of the required information from Rule 4.07.3(3) <br />except for item (h). Please provide the name of the drilling contractor and the license number of the <br />drill and rig used to seal the coreholes. <br />The amount/volume of cement used for each hole was reported as gallons. Based on our discussion, it <br />appears the volume reported for each drill hole exceed the volume that was necessary for each hole and <br />the excess material was placed in an adjacent pit and then transported elsewhere to be used. In the future, <br />please report only the volume used to seal each hole. <br />Rule 4.07.3(3) requires that proof of compliance of permanent sealing of drill holes be submitted within <br />60 days after abandoning a drill hole, specific drilling program or when requested by the Division. In the <br />future, please submit the required proof of compliance within the 60 day timeframe. <br />If you have any questions feel free to contact me at (303) 866-3567, extension 8120. <br />Sincerely, <br />1313 Sherman Street, Room 215, Denver, CO 80203 P 303.866.3567 F 303.832.8106 http://mining.state.co.us <br />John W. Hickentooper, Governor I Mike King, Executive Director I Virginia Brannon, Director \ x 1&76 <br />