My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-02-24_REVISION - C2010089 (2)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C2010089
>
2016-02-24_REVISION - C2010089 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:19:30 PM
Creation date
2/24/2016 2:50:03 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C2010089
IBM Index Class Name
Revision
Doc Date
2/24/2016
Doc Name
Proposed Decision Letter & Form
From
DRMS
To
Tri-State Generation and Transmission Association, Inc
Type & Sequence
MR16
Email Name
BFB
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />1313 Sherman Street, Room 215, Denver, CO 80203 P 303.866.3567 F 303.832.8106 http://mining.state.co.us <br />John W. Hickenlooper, Governor | Mike King, Executive Director | Virginia Brannon, Director <br />1313 Sherman Street, Room 215 <br />Denver, CO 80203 <br /> <br /> <br />February 24, 2016 <br /> <br /> <br />Chris Gilbreath <br />Tri-State Generation and Transmission Association, Inc <br />P.O. Box 33695 <br />Denver, CO 80233-0695 <br /> <br /> <br />Re: New Horizon North Mine (Permit No. C-2010-089) <br /> Minor Revision No. 16 (MR- 16) <br /> Coal Stockpile Revisions. <br /> <br /> <br />Dear Mr. Gilbreath: <br /> <br />Enclosed you will find the Division of Reclamation, Mining and Safety's Decision Form for Minor <br />Revision No. 16 at the New Horizon North Mine. <br /> <br />Please refer to the Performance Bond heading on the enclosed decision form. If the amount of <br />Bond Held equals or exceeds the Revised Liability, you need not submit additional bond. However, <br />if the Revised Liability exceeds the Bond Held, please submit additional bond or rider to your <br />existing bond that equals or exceeds the Revised Liability. This Minor Revision must not be <br />implemented until any required increase in bond is submitted to and approved by the Division. <br /> <br />If there are stipulations attached, please sign and return the decision form to the Division. <br /> <br />If you have any questions, please contact me. <br />
The URL can be used to link to this page
Your browser does not support the video tag.