Laserfiche WebLink
February 16, 2016 C-2010-089/New Horizon North Mine BFB <br />configuration of the Pond 001 east ditch will not change. <br />GENERAL MINE PLAN COMPLIANCE: <br />WFC is preparing to install the northern end of Pond 1 East Ditch as specified in the permit. The Pond 1 <br />ditch will connect with the north ditch of Pond 2 at the top of the hill. Frank Ferris and Trevor Ragsdale explained <br />that this section of the mine has buried ledge rock which could create unique challenges to the construction of the <br />ditch. The Division understands that the ditch may not be built to designed specifications due to unknown ground <br />conditions and will work with WFC to build the ditch. <br />ENFORCEMENT ACTIONS/COMPLIANCE <br />No enforcement actions were initiated as a result of this inspection, nor are any pending. <br />PHOTOGRAPHS <br />Photo I — Bald Eagle Nest North of Mine Pit Photo 2 — Pump at the NH Pond <br />Photo 3 — Pond 001 Photo 4 — Pond 001 East Ditch Segment 7 <br />Number of Partial Inspection this Fiscal Year: 5 <br />Number of Complete Inspections this Fiscal Year: 3 <br />Page 3 of 3 <br />