My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-02-24_HYDROLOGY - C1981018
DRMS
>
Day Forward
>
Hydrology
>
Coal
>
C1981018
>
2016-02-24_HYDROLOGY - C1981018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:19:29 PM
Creation date
2/24/2016 10:50:24 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981018
IBM Index Class Name
Hydrology
Doc Date
2/24/2016
Doc Name
2015 Stormwater Annual Report
From
Blue Mountain Energy
To
DRMS
Annual Report Year
2015
Permit Index Doc Type
NPDES
Email Name
CCW
JRS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Blue Mountain Energy, Inc. <br />2015 Stormwater Annual Report <br />Permit Certification No. COR -040172 <br />ATTACHMENTS <br />A. Inspections were made and maintenance actions taken to ensure compliance with the <br />permit. No violations of the Stormwater Permit were noted. Current BMPs are <br />working properly. Routine maintenance performed including ditch cleaning and <br />sediment removal when and where warranted. <br />During 2015 we saw a below normal winter precipitation with higher than normal <br />precipitation during May (3.63" vs. 1.00"). Summer was abnormally dry with wetter <br />than normal conditions returning in mid-October through the end of the year. <br />Overall, 2015 had above average precipitation with 13.97 inches compared to the <br />average annual precipitation of 10.02 inches. <br />No storm event with unusually high intensity was noted. <br />The Stormwater Management Plan was reviewed and no changes were warranted. <br />Since the SWMP incorporates BME's Mining Permit by reference most changes are <br />reviewed and addressed within the context of the Mining Permit administered by the <br />Division of Reclamation, Mining and Safety. Several changes were made to the <br />Mining Permit but none that altered BMP practices regarding control or management <br />of stormwater. <br />B. First quarterly inspection — March 12. Site in compliance with Stormwater Permit. <br />Second quarterly inspection — June 24. Site in compliance with Stormwater Permit. <br />Third quarterly inspection — September 17. Site in compliance with Stormwater <br />Permit. <br />Fourth quarterly inspection — December 3. Site in compliance with Stormwater <br />Permit. <br />Quarterly inspections were conducted concurrent with State oversight inspections <br />from the Colorado Division of Reclamation, Mining and Safety. Many other <br />inspections occurred throughout the year to identify and address potential problems in <br />specific areas. Maintenance and repairs were performed to address issues while <br />maintaining compliance. <br />
The URL can be used to link to this page
Your browser does not support the video tag.