My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-02-24_HYDROLOGY - C1981018
DRMS
>
Day Forward
>
Hydrology
>
Coal
>
C1981018
>
2016-02-24_HYDROLOGY - C1981018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:19:29 PM
Creation date
2/24/2016 10:50:24 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981018
IBM Index Class Name
Hydrology
Doc Date
2/24/2016
Doc Name
2015 Stormwater Annual Report
From
Blue Mountain Energy
To
DRMS
Annual Report Year
2015
Permit Index Doc Type
NPDES
Email Name
CCW
JRS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STORMWATER ANNUAL REPORT - METAL MINING (& COAL) Print Form <br />COLORADO DEPT. OF PUBLIC HEALTH & ENVIRONMENT <br />Water Quality Control Division <br />WQCD-P-B2 <br />4300 Cherry Creek Drive South <br />Denver, Colorado 80246-1530 <br />Make enough copies of form for each reporting year. Or go to <br />www.cdphe.state.co.us/wq/Permits Unit Check if this is a <br />Permittee (Company Name): Blue Mountain Ener y Inc <br />Facility Name: Deserado Mine ❑ <br />Mailing Address: 3607 CR 65: Rangely, CO 81648 p <br />Facility Phone Number: 970-675-4322 0 <br />Permit Certification No. COR -041 0 11 17 2 <br />THIS IS A REQUIRED FIELD If this is not filled in the report will be returned. — Please do not input 110000" <br />Reporting Period: Jan. 1 -Dec. 31, 20 1 5 (Form is due by Feb. 15 of the following year) <br />**Each section must be completed. Please print or type.** <br />A. A report on the facility's overall compliance with the SWAP. (Include here a summary of any measures taken <br />to comply with your Stormwater Management Plan (SWMP), to fully implement it, changes or improvements <br />made in any of your Best Management Practices (BMPs), employee training, spills, other problems <br />encountered, etc. How is your plan working?) <br />See attached (A) <br />Were changes made to your SWMP? ®No ® Yes - Describe changes on a separate sheet. <br />B. A summary of each comprehensive stormwater facility inspection made, including date.:ndings. and action <br />taken. (The permit requires at least two comprehensive facility inspections per year - see page 12 of the <br />permit. Include here a summary of those inspections, plus any other comprehensive inspections made. It is <br />not necessary to summarize day-to-day inspections, unless significant problems were noted.) <br />First Inspection - Date <br />See attached (B) <br />Findings, and action taken: <br />Note - form may be reproduced Page l of 2 ar6/06mm <br />
The URL can be used to link to this page
Your browser does not support the video tag.