Laserfiche WebLink
Exhibit D - Reclamation Plan: We will perform concurrent partial reclamation of the <br /> trench(s) as we mine and perform a final reclamation of all trenches at the close of <br /> each mining project <br /> All disturbed areas will be back-filled, re-contoured and re-seeded with US Forest <br /> approved seed mixtures and planted with ponderosa trees if applicable at the end of <br /> each project period. <br /> At the termination of the operations all disturbances will receive a final re-grading, <br /> re-seeding, re-planting and monitored for one calendar year or until 70% re-growth <br /> is observed. This includes all prior disturbances within bonded area of claim. <br />