Laserfiche WebLink
Mr. Rick Parsons, P.E. February 10, 2016 <br /> L.G. Everist Combined SWSP <br /> Page 8 of 14 <br /> L.G. Everist has fully reusable supplies stored in the Rinn Valley Phase 3 Reservoir and Star <br /> Water Resource Reservoir. The Rinn Valley Phase 3 Reservoir exercised its first fill and most of its <br /> refill water rights decreed in case no. 2005CW315 during the 2015 water year. The liner for the Star <br /> Water Resource Reservoir was approved on December 16, 2014 and water was stored in priority with <br /> the water commissioner's approval during April 2015. As of November 1, 2015 these was approximately <br /> 357 acre-feet of water stored in the Rinn Valley Phase 3 Reservoir and 845 acre-feet stored in the Star <br /> Water Resource Reservoir. This water is available among other uses for augmentation purposes in this <br /> SWSP. The amounts of storage water in the Rinn Valley Phase 3 Reservoir and Star Water Resource <br /> Reservoir projected for use for replacement purposes during the period of this SWSP is presented in <br /> Table 5 below (taken from the SWSP report): <br /> Table 5 <br /> L.G. Everist Reusable Storage Supplies Summary <br /> Rinn Valley Phase 3 Star Water Resource Total <br /> 2016 As of Nov 2015 357 acre-feet 845 acre-Feet 1.202 acre-feet <br /> Used in 2016 362 acre-feet* 391 acre-feet 753 acre-feet <br /> 2017 2017 fill 296 acre-feet 260 acre-feet 556 acre-feet <br /> Used in 2017 7 acre-feet 715 acre-feet 722 acre-feet <br /> Remaining" 2016 0 acre-feet* 460 acre-feet 460 acre-feet <br /> _017 350 acre-feet 131 acre-feet 480 acre-feet <br /> *Assumes 5 acre-feet refill to meet STIH 2016 kasc drliveries(to simpliry Lxcc)algorithm) <br /> "Fortion of waicr remaining in 2016 tw:eded for 2017 deliteries <br /> This summary of use of storage includes the additional SWSP demand of 362 acre-feet of <br /> replacement water leased to the Big Thompson Investment Holdings Group during the 2016 calendar <br /> year. According to the 2016 and 2017 proposed accounting for the Saint Vrain Creek Pits (Table 11) no <br /> water from Rinn Valley Phase 3 Reservoir is proposed to be used in this SWSP since the entire amount <br /> in storage and the forecasted refill is leased to Big Thompson Investment Holdings Group ("BTIH") for <br /> their SWSPs (pending case nos. 2012CW179 and 2014CW3046). Although, only releases of water in <br /> storage from Star Water Resource Reservoir was presented in Table 11, the source that will ultimately <br /> be used for both BTIH lease and Everist's SWSP is contingent on the location of the call and location of <br /> uses. Nevertheless sufficient replacement water is available is storage in the Rinn Valley Phase 3 <br /> Reservoir and Star Water Reservoir to satisfy both the lease and the replacement requirement under <br /> this SWSP. Releases of replacement water will be made at or above the point of the downstream <br /> calling right. Releases from the Star Water Resource Reservoir (approximately 10 miles upstream of <br /> the South Platte River) will be delivered into the Cache La Poudre River in the SW1/4 of the SE1/4 of <br /> Section 26, Township 6 North, Range 66 West, of the 6th P.M. No transit losses associated with the <br /> releases from Star Water Reservoir were assessed under this SWSP to cover the depletions on the Saint <br /> Vrain Creek since the points of depletions are upstream of the Cache La Poudre River and the South <br /> Platte River confluence. Releases from this Rinn Valley Reservoir to cover the Saint Vrain Creek Pits <br /> will account for the transit losses to Saint Vrain Creek of approximately 3.7 percent based on about 15 <br /> river miles from the reservoir releases to Saint Vrain River down to the confluence with the South <br /> Platte River times 0.50 percent per mile summer transit loss and 0.25 percent winter transit loss per <br /> mile. The transit loss percentages are subject to change depending upon current conditions. If transit <br /> losses change they will be communicated by the Division Engineer via email to the Division One Call <br /> List. The applicant shall obtain prior permission from the District 2, 3 and 5 Water Commissioners <br /> when making releases from these reservoirs. Credit will not be given to any releases not measured and <br /> recorded to the satisfaction of the District 2, 3 or District 5 Water Commissioners or Division Engineer. <br />