My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-02-17_HYDROLOGY - M1996052
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M1996052
>
2016-02-17_HYDROLOGY - M1996052
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/12/2020 10:03:59 PM
Creation date
2/22/2016 2:49:57 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1996052
IBM Index Class Name
Hydrology
Doc Date
2/17/2016
Doc Name
Substitute Water Supply Plan
From
DWR
To
DRMS
Email Name
ECS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Rick Parsons, P.E. February 10, 2016 <br /> L.G. Everist Combined SWSP <br /> Page 11 of 14 <br /> 9. The replacement water, which is the subject of this plan, cannot be sold or leased to any other <br /> entity. As a condition of subsequent renewals of this substitute water supply plan, the <br /> replacement water must be appurtenant to this site until a plan for augmentation is obtained. <br /> All replacement water must be concurrent with depletions in quantity, timing, and location. <br /> 10. The name, address, and phone number of the contact person who will be responsible for the <br /> operation and accounting of this plan must be provided on the accounting forms submitted to the <br /> division engineer and the water commissioner. <br /> 11. Conveyance loss for delivery of augmentation water to the South Platte River, Saint Vrain Creek <br /> and the Cache La Poudre River is subject to assessment and modification as determined by the <br /> division engineer. <br /> 12. The Division Engineer, or his designated representative, will administer all such water <br /> transported in the South Platte River or its tributaries under this SWSP, including water for <br /> replacement of depletions, past intervening headgate to ensure that such water is not <br /> intercepted or otherwise diminished in quantity by diversion, use or other interference by <br /> intervening water rights and to assure that such water remains available and suitable for <br /> Applicant's uses under this SWSP, except when any intervening headgate is diverting the entire <br /> flow of ("sweeping") the river. In the event that delivery past headgate which sweep the river <br /> requires the installation of a bypass structure or the use of an existing bypass structure by <br /> agreement with a third-party, Applicant is responsible for either installation a new bypass <br /> structure with a continuous recording measuring device(s) as approved by the Water <br /> Commissioner or securing an agreement with a third-party to use an existing bypass structure <br /> and providing such information and agreement to the Division Engineer. <br /> 13. All diversions shall be measured in a manner acceptable to the Division Engineer. The Applicant <br /> shall install and maintain such measuring devices as required by the Division Engineer for <br /> operation of this SWSP. In addition, the applicant shall maintain daily records of all diversions, <br /> replacements, and the amount of water used for each particular purpose. The applicant shall <br /> provide a report of these records to the division engineer and the water commissioner on a <br /> monthly basis on a form approved by them. The accounting must be submitted to the division <br /> engineer in Greeley (Div1Accountin�@state.co.us) and the water commissioners (Brent Schantz <br /> at Brent.Schantz@state.co.us, Shera Sumerford at Shera.Sumerford@state.co.us and Mark <br /> Simpson at Mark.Simpson@state.co.us) within 30 calendar days of the end of the month for <br /> which the accounting is being made. Submitted accounting shall conform to the Administration <br /> Protocol - Augmentation Plan Accounting. <br /> 14. The Applicant shall perform an inspection and provide verification that the land associated with <br /> the changed water right in this SWSP has been removed from irrigation during the term of this <br /> SWSP. Verification of dry-up must be in the form of an affidavit signed by an individual with <br /> personal knowledge of the dry-up for the entire irrigation season for each parcel of land <br /> associated with the change of water right in this SWSP. In accordance with the attached <br /> Administration Protocol - Dry-Up of Irrigated Land, the Applicant shall provide a written <br /> notification to the water commissioner and division engineer by April 1, 2016 and April 1, <br /> 2017 identifying the lands to be dried-up for the 2016 and 2017 irrigation season. By October <br /> 31, 2016 and October 31, 2017, the Applicant shall provide an affidavit to the water <br /> commissioner and division engineer that confirms dry-up during the 2016 and 2017 irrigation <br /> season. A GIS shapefile outlining the dry-up must accompany each affidavit and be emailed to <br /> DivlAccounting@state.co.us for each notification. The shapefile shall include the WDID of the <br /> plan, a delineation of the dried-up land, the acreage of dry-up, and any accompanying <br /> metadata. In addition, the datum must be NAD83 and the UTM projection must be Zone 13. <br />
The URL can be used to link to this page
Your browser does not support the video tag.