My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-02-17_HYDROLOGY - M2006003 (3)
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M2006003
>
2016-02-17_HYDROLOGY - M2006003 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/12/2020 10:12:43 PM
Creation date
2/22/2016 2:42:16 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2006003
IBM Index Class Name
Hydrology
Doc Date
2/17/2016
Doc Name
Combined Substitute Water Supply Plan
From
DWR
To
DRMS
Email Name
ECS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Table 1 <br /> Brighton Pit <br /> Evaporative and Operational Losses <br /> Percentof Average Net Water Surface Net Water Surface <br /> Month Evaporation Gross Evaporation Precipitation Effective Precipitation Net Evaporation Evaporation Tranehas Evaporation Ponds <br /> 0.00 Acres 6.50 Acre <br /> inches inches inches Inchiss acre-feet acre-feel <br /> 0) (2) (3) (4) (5) (6a) (6b) <br /> Jan•15 3.0% 1.37 048 0.34 1.03 0.00 0,56 <br /> Feb-15 3.5% 1.59 041 0.29 131 0.00 0.71 <br /> Mar-15 5.5% 2.50 1.26 088 1,62 0.00 0.88 <br /> Apr-15 9.0% 4.10 1.56 1.09 3.00 0.00 163 <br /> May-15 120% 5.46 2.56 1.79 3.67 000 199 <br /> Jun-15 14.5% 6.60 1.84 129 5.31 0,00 2.88 <br /> Jul•15 15.0% 6.83 1,55 1.09 5.74 000 3.11 <br /> Aug-15 13.5% 6.14 1.53 107 5.07 000 2.75 <br /> Sap-15 10.0% 4.55 1.01 0.71 3.84 0,00 208 <br /> Oct-15 7.0% 3.19 0.87 061 2.58 0.00 1.40 <br /> Nov-15 4 0% 1.82 0.93 065 1.17 000 0.63 <br /> Deo-15 30% 1,37 0.55 0.39 0.98 0.00 0.53 <br /> Total 100.0% 45.50 14.55 10.19 35.32 0.00 19.15 <br /> Percent of Annual Amount of <br /> Aggregate Aggregate Water Lost with Percent of Annual Amount of Concrete Water Used in Concrete Water Used for Total Evaporation R Lagged Pond Use Lagged Well flee Lagged Evaporation 8 <br /> Month Production Production Mined Product Concrete Production Production Batching Dust Control Operational Losses (Evep,Mine,Dust) (Concrete) Operational Losses <br /> tans acre-feet cubicyards) acre-feel acre-feel acre-feel acre-feet acre-fee! acre-feel <br /> (7) (8) (9) (10) (11) (121 (13) (14) (15) (16) (17) <br /> Jan.15 5.1% 0 0.00 5.1% 6.843 084 000 1.40 -2.24 -102 -326 <br /> Feb-15 4.9% 0 000 49% 6,598 0.81 0.00 1.52 -2 .1.01 -301 <br /> Mar•15 12.1% 0 0.00 12.1% 16,211 1.99 0.36 3.23 -1.84 .1 -284 <br /> Apr-15 10.5% 0 0.00 105% 14,093 1,73 0.36 372 -179 -1.02 -2.81 <br /> May-15 10.5% 0 0.00 105% 14,093 173 0,36 408 -1,85 .104 -2.89 <br /> Jun-15 10.0% 0 000 10.0% 13,360 164 036 4.88 -195 -1.03 -2.98 <br /> Jul-15 9.3% 0 0.00 93% 12,464 1,53 0.36 500 -2.12 .108 -3.20 <br /> Aug-15 10.1% 0 0.00 10.1% 13.441 165 036 4.76 -229 .1.15 -3.44 <br /> Sep-15 9.8% 0 0.00 98% 13,034 160 0.36 4.04 -2,36 .1,17 -3.53 <br /> Oct-15 7.7% 0 0.00 7 7% 10,264 1.26 0.36 3.02 -2.32 -1.2 -3.52 <br /> Nov-15 49% 0 0.00 4.9% 6,598 0.81 0.36 180 -22 .1.17 -3.37 <br /> Dw-15 4.9% 0 0.00 49% 6,598 0.81 000 1.34 -201 -1.1 .3.11 <br /> Total 100.o% 0 0.00 100.0% 133.599 16.40 3-24 39.79 .24.97 -12.99 .37.96 <br /> (1)From SB 120,the evaporation percentages are for gravel pits with elevations below 6.500 feet <br /> (2)Equals Percent of Annual Evaporation times 45.5 inches <br /> (3)From Colorado State University's Colorado Climate Center web page,http//cccalmos.colostate.edu for Brighton Weather Statior <br /> (4)Equals Column(3)x 0 70.70 percent value was taken from SB 120 <br /> (5)Equals Column(2)-Column(4).11 the resullant value is less than zero then a zero is substiluled <br /> (6a)Equals Column(5y12 x acres tot de-waler trenches <br /> (6b)Equals Column(5N12 x acres fa sill ponds. <br /> (7)Based on information from Beslway. <br /> (8)Equals Column(7)x tons per year.Production based on information from Bastway.This is production from the mining operation on the West Sk <br /> (9)Equals Column(8)times 2000 times 4%divided by 62.4 divided by 43,%0 <br /> (10)Based on information from Bestway. <br /> (11)Equals Column(10)times cubic yards per year.Production based m information it=Bestway <br /> (12)Equals Column(11)times 40 gallons divided by 325851.Assume a use of 50 galons per wbnc yard of wrvxete prod.im <br /> (13)Equals 6000 gallons per day limas number of operating days(20 days)in the month divided by 325851,during production months(March thru November) <br /> (14)Equals column(6a)+Column(6b)-Column(9)+Column(12)-Column(13) <br /> (15)From SDF depletion model-distance weighted SDF for dewatenng bench=205 days(trench on west side increased by 40%from 195 days to 270 days; <br /> (16)From SDF depletion model.SDF for Batch Planl well=176 days(increased from 68 days based on MODFLOW analysis) <br /> (17)Total lagged evaporative and operational losses(from AWAS).Total of Column(15)+Column(16) <br /> 10/12015 3:\Hallimin-105\Water Resources\Cmvel Pits Civil Resoumes\BnghtonSWSP-Civil Resources\2016 SWSP-Brghton\BnghimSWSP_16_including litvak FD.xIs <br />
The URL can be used to link to this page
Your browser does not support the video tag.