Laserfiche WebLink
200 <br />210 <br />Equipment MobilizationlDemobilization <br />Total = <br />1 <br />1 <br />Performance bond: <br />$41,510.00 <br />$77,982.86 <br />Mobilize/Demobilize Equipment from Hayden, <br />Colorado <br />MOBILIZE <br />3.37 <br />Miscellaneous Reclamation Tasks <br />Total = <br />$400,561.63 <br />Site Maintenance During Reclamation and Ten- <br />Year Liability <br />SITEMAINT <br />ENANCE <br />300.00 <br />SUBTOTALS: <br />10778.83 <br />$8,439,877 <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT: <br />Liability insurance: <br />2.02 <br />Total = <br />$170,485.52 <br />Performance bond: <br />1.05 <br />Total = <br />$88,618.71 <br />Job superintendent: <br />5,378.11 <br />Total = <br />$400,561.63 <br />Profit: <br />10.00 <br />Total = <br />$843,987.70 <br />TOTAL O & P = <br />$1,503,653.56 <br />CONTRACT AMOUNT (direct + O & P) = <br />$9,943,530.56 <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT: <br />Financial warranty processing (legal/related costs): <br />Engineering work and/or contractibid preparation: <br />Reclamation management and/or administration: <br />0.00 <br />4.00 <br />3.13 <br />Total = <br />Total = <br />0.00 <br />$397,741.22 <br />$311,232.51 <br />CONTINGENCY: 0.00 Total = $0.00 <br />TOTAL INDIRECT COST = $2,212,627.29 <br />TOTAL BOND AMOUNT (direct + indirect) = $10,652,504.29 <br />