Laserfiche WebLink
100 <br />100a <br />101 <br />102 <br />103 <br />104 <br />105 <br />106 <br />110 <br />111 <br />112 <br />113 <br />114 <br />115 <br />116 <br />117 <br />118 <br />130 <br />131 <br />132 <br />133 <br />134 <br />135 <br />136 <br />137 <br />138 <br />139 <br />140 <br />141 <br />142 <br />143 <br />144 <br />145 <br />146 <br />147 <br />148 <br />149 <br />150 <br />151 <br />153 <br />Rip New CRDA Topsoil Stockpile Access Road; <br />MR290 <br />RIPPER <br />1 <br />2 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />2 <br />2 <br />2 <br />1 <br />2 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />3 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />0.82 <br />Regrade 13LT Outby Utility Borehole Road Area; <br />MR291 <br />DOZER <br />7.74 <br />Earthwork - Drainage Control <br />Regrade Ditch D-3 <br />DOZER <br />29.24 <br />Regrade Ditch E-1 <br />DOZER <br />12.63 <br />Regrade Ditch F-1 and Pond F Ditches <br />DOZER <br />21.26 <br />Regrade Ditches G -la, G -lb, G -lc, and Million <br />Gallon Tank No <br />DOZER <br />25.90 <br />Regrade Ditch G-4 <br />DOZER <br />19.27 <br />Regrade West Rail Loop Diversion Ditch <br />DOZER <br />2.15 <br />Backfill and Regrade Pond B <br />DOZER <br />7.61 <br />Backfill and Regrade Pond C <br />DOZER <br />19.94 <br />Backfill and Regrade Pond D <br />DOZER <br />22.43 <br />Backfill and Regrade Pond E <br />DOZER <br />17.45 <br />Backfill and Regrade Pond F <br />DOZER <br />27.57 <br />Backfill and Regrade Pond G <br />DOZER <br />34.46 <br />Backfill and Regrade Pond T <br />DOZER <br />2.44 <br />Backfill and Regrade 6 North Main Holding Pond <br />Embankments, <br />DOZER <br />35.97 <br />Backfill and Regrade 18 Left Vent Shaft Ponds <br />DOZER <br />8.10 <br />Earthwork - Topsoil <br />Replace Topsoil at Portal Surface Area <br />SCRAPERI <br />38.43 <br />Replace Topsoil at Office/Bathhouse <br />SCRAPERI <br />39.54 <br />Replace Topsoil at Parking Lot and Laydown Area <br />SCRAPERI <br />51.83 <br />Replace Topsoil at Stoker Coal Loading Area <br />SCRAPERI <br />1.29 <br />Replace Topsoil at Refuse Area, Refuse Area <br />Expansion Phase <br />SCRAPERI <br />275.49 <br />Replace Topsoil on Haulroad B <br />SCRAPERI <br />62.69 <br />Replace Topsoil on Fish Creek Borehole Area and <br />Road <br />SCRAPERI <br />9.72 <br />Replace Topsoil on Explosives Storage Area <br />SCRAPERI <br />4.54 <br />Replace Topsoil on Truck Loadout and Haulroad C <br />SCRAPERI <br />55.72 <br />Replace Topsoil on Pond E and Haulroad B <br />SCRAPERI <br />4.00 <br />Replace Topsoil on Pond E Relocation Area <br />SCRAPERI <br />9.45 <br />Replace Topsoil on Batch /Weigh Loadout <br />Stockpile Area <br />SCRAPERI <br />3.91 <br />Replace Topsoil on 18 Right West Portion Access <br />Road <br />SCRAPERI <br />3.23 <br />Replace Topsoil on 18 Right East Central Portion <br />Access Road <br />SCRAPERI <br />2.03 <br />Replace Topsoil on 18 Right Northeast Portion <br />Access Road <br />SCRAPERI <br />0.60 <br />Replace Topsoil on West Haulroad <br />SCRAPERI <br />0.63 <br />Replace Cover Material on Refuse Disposal Area <br />SCRAPERI <br />122.56 <br />Replace Topsoil on Main Facilities <br />Access/Haulmad Area <br />SCRAPERI <br />7.00 <br />Haul and Replace Topsoil to Fish Creek Tipple <br />TRUCKI <br />31.01 <br />Haul and Replace Topsoil to "Trudy's Corner" <br />Laydown Area <br />TRUCK1 <br />12.46 <br />Replace Topsoil on 10 Right Dewatering Borehole <br />DOZER <br />14.35 <br />Replace Topsoil on Eastern Mining District Vent <br />Shaft Area <br />DOZER <br />95.34 <br />Replace Topsoil on 6 North Main Vent Shaft Pad <br />and Access Ro <br />DO!TR7 <br />58.42 <br />$219.00 <br />$3,346.00 <br />$2,208.00 <br />$954.00 <br />$1,605.00 <br />$1,956.00 <br />$1,455.00 <br />$163.00 <br />$2,627.00 <br />$6,889.00 <br />$7,750.00 <br />$6,028.00 <br />$9,525.00 <br />$11,906.00 <br />$844.00 <br />$12,428.00 <br />$2,800.00 <br />$81,579.00 <br />$83,933.00 <br />$110,028.00 <br />$1,723.00 <br />$656,139.00 <br />$99,638.00 <br />$15,450.00 <br />$6,033.00 <br />$74,129.00 <br />$5,315.00 <br />$12,577.00 <br />$5,202.00 <br />$3,672.00 <br />$2,307.00 <br />$680.00 <br />$712.00 <br />$389,026.00 <br />$11,130.00 <br />$40,008.00 <br />$16,076.00 <br />$2,336.00 <br />$15,517.00 <br />$9,508.00 <br />