Laserfiche WebLink
Task description: <br />Site: Foidel Creek Mine <br />BULLDOZER WORK <br />Backfill and Regrade West Haulroad Truck Scale Foundation an <br />Permit Action: SI2 Permit/Job#: C1982056 <br />PROJECT IDENTIFICATION <br />Task #: 018 State: Colorado <br />Date: 2/17/2016 County: Routt <br />User: JLE <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: <br />Cat D10T - 10SU <br />Horsepower: <br />574 <br />Blade Type: <br />Semi -Universal <br />Attachment: <br />NA <br />Shift Basis: <br />1 per day <br />Data Source: <br />(CRG) <br />Cost Breakdown: <br />NA <br />Abbreviation: None <br />Filename: 018 <br />Total unit Cost/Hour: $345.47 <br />Total Fleet Cost/Hour: $345.47 <br />MATERIAL OUANTITIES <br />Initial Volume: 510 <br />Swell factor: 1.125 <br />Loose volume: 574 LCY <br />Source of estimated volume: <br />Source of estimated swell <br />factor: <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly <br />production: <br />Materials consistency <br />description: <br />Average push <br />gradient: <br />Average site altitude: <br />Material weight: <br />0% <br />Division of Reclamation, Mining & Safety <br />Cat Handbook <br />50 feet <br />2,748.7 LCY/hr <br />Consolidated stockpile 1.0 <br />7,000 feet <br />2,650 lbs/LCY <br />Weight description: Decomposed rock - 25% Rock, 75% Earth <br />Job Condition Correction Factor Source <br />Operator Skill: 0.750 (AVG.) <br />Utilization % <br />Ownership Cost/flour: <br />$133.56 <br />NA <br />Operating Cost/Hour: <br />$173.02 <br />100 <br />Ripper op. Cost/Hour: <br />$0.00 <br />15 <br />Operator Cost/Hour: <br />$38.89 <br />NA <br />Total unit Cost/Hour: $345.47 <br />Total Fleet Cost/Hour: $345.47 <br />MATERIAL OUANTITIES <br />Initial Volume: 510 <br />Swell factor: 1.125 <br />Loose volume: 574 LCY <br />Source of estimated volume: <br />Source of estimated swell <br />factor: <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly <br />production: <br />Materials consistency <br />description: <br />Average push <br />gradient: <br />Average site altitude: <br />Material weight: <br />0% <br />Division of Reclamation, Mining & Safety <br />Cat Handbook <br />50 feet <br />2,748.7 LCY/hr <br />Consolidated stockpile 1.0 <br />7,000 feet <br />2,650 lbs/LCY <br />Weight description: Decomposed rock - 25% Rock, 75% Earth <br />Job Condition Correction Factor Source <br />Operator Skill: 0.750 (AVG.) <br />