Laserfiche WebLink
Material consistency: <br />0.900 <br />Dozing method: <br />1.000 <br />Visibility: <br />1.000 <br />Job efficiency: <br />0.830 <br />Spoil pile: <br />0.800 <br />Push gradient: <br />0.666 <br />Altitude: <br />1.000 <br />Material Weight: <br />0.902 <br />Blade type: <br />1.000 <br />Net correction: 0.2692 <br />Adjusted unit 334.67 LCY/hr <br />production: <br />Adjusted fleet 334.67 LCY/hr <br />production: <br />JOB TIME AND COST <br />Fleet size: 1 Dozer(s) <br />Unit cost: $1.101/LCY <br />Total job time: 4.99 Hours <br />Total job cost: $1,838 <br />(CAT HB)) <br />(GEN.) <br />(AVG.) <br />(1 SHIFT/DAY) <br />(FND-RF) <br />(CAT HB) <br />(CAT HB) <br />(CAT HB) <br />(PAT) <br />