My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-02-22_REVISION - C1982056
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1982056
>
2016-02-22_REVISION - C1982056
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:19:25 PM
Creation date
2/22/2016 11:11:50 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982056
IBM Index Class Name
Revision
Doc Date
2/22/2016
Doc Name
Updated Reclamation Cost Estimate and Proposed Liability
From
DRMS
To
Twentymile Coal, LLC
Type & Sequence
SI2
Email Name
JLE
DIH
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
432
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BULLDOZER WORK <br />Task description: Regrade Shop/Warehouse/Parking/Stoker Areas <br />Site: Foidel Creek Mine Permit Action: SI2 Permit/Job#: C1982056 <br />PROJECT IDENTIFICATION <br />Task #: 002 <br />Date: 2/17/2016 <br />User: JLE <br />State: Colorado <br />County: Routt <br />Agency or organization name: DRMS <br />Basic Machine: <br />Cat D10T - 10SU <br />Horsepower: <br />574 <br />Blade Type: <br />Semi -Universal <br />Attachment: <br />NA <br />Shift Basis: 1 per day <br />Data Source: (CRG) <br />Cost Breakdown: <br />Abbreviation: None <br />Filename: 002 <br />Total unit Cost/Hour: $345.47 <br />Total Fleet Cost/Hour: $345.47 <br />MATERIAL QUANTITIES <br />Initial Volume: 38,720 <br />Swell factor: 1.125 <br />Loose volume: 43,560 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell Cat Handbook <br />factor: <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly <br />production: <br />200 feet <br />946.0 LCY/hr <br />Materials consistency Compacted fill or embankment 0.9 <br />description: <br />Average push <br />gradient: <br />Average site altitude: <br />Material weight: <br />0% <br />7,000 feet <br />2,650 lbs/LCY <br />Weight description: Decomposed rock - 25% Rock, 75% Earth <br />Job Condition Correction Factor Source <br />Operator Skill: 0.750 (AVG.) <br />Utilization % <br />Ownership Cost/flour: <br />$133.56 <br />NA <br />Operating Cost/Hour: <br />$173.02 <br />100 <br />Ripper op. Cost/Hour: <br />$0.00 <br />0 <br />Operator Cost/Hour: <br />$38.89 <br />NA <br />Total unit Cost/Hour: $345.47 <br />Total Fleet Cost/Hour: $345.47 <br />MATERIAL QUANTITIES <br />Initial Volume: 38,720 <br />Swell factor: 1.125 <br />Loose volume: 43,560 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell Cat Handbook <br />factor: <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly <br />production: <br />200 feet <br />946.0 LCY/hr <br />Materials consistency Compacted fill or embankment 0.9 <br />description: <br />Average push <br />gradient: <br />Average site altitude: <br />Material weight: <br />0% <br />7,000 feet <br />2,650 lbs/LCY <br />Weight description: Decomposed rock - 25% Rock, 75% Earth <br />Job Condition Correction Factor Source <br />Operator Skill: 0.750 (AVG.) <br />
The URL can be used to link to this page
Your browser does not support the video tag.