Colorado Division of Reclamation, Mining and Safety
<br />Annual Reclamation Report for the Year 2015
<br />Lorencito Canyon C1996084
<br />New Elk Coal Company
<br />mine name permit # Permittee
<br />Address: 12250 Hwy 12, Weston, CO 81091
<br />This report, required by Rule 2.04.13, is due by February 15 of each year, or other date, as agreed upon
<br />by the Division. It should include text, discussion, and maps, at a minimum, in addition to any other
<br />reclamation monitoring data as required by the approved permit. The location of the acreage reported
<br />under each land status category and year of seeding (if applicable) should be clearly and accurately
<br />identified on a map included with the report.
<br />Land Status. -Category
<br />Last Years
<br />Cumulative Total
<br />This Calendar
<br />Year
<br />Cumulative Total'
<br />Acres disturbed
<br />155.6
<br />+
<br />0.0
<br />=
<br />155.6
<br />Acres backfilled and graded
<br />122.5
<br />+
<br />0.0
<br />=
<br />122.5
<br />Acres to soiled
<br />123.9
<br />+
<br />0.0
<br />=
<br />123.9
<br />Seeding typically begins the minimum 10 -year reclamation liability period. Please report the acres for
<br />each cateaory helnw nn not Inr-hiric nt-roe fki f k-_ .,..4.:...
<br />I .. ..,.,,,,,,,,,.,j, —,N-,-„ vi ally auyIIICInCu sCeunly ur Cultural practices
<br />For the Entire Life of Mine the total number of acres disturbed 155.6 and the total number of acres:
<br />Phase I released 122.1 Phase II released 0.0 Phase III released 27.2
<br />For Mines in Permanent Cessation:
<br />Total acreage in facilities subject to reclamation but yet to be completed 1 .8
<br />For Government Performance and Results Act
<br />Acreage in long-term mining or reclamation facilities 25'9
<br />Acreage in active mining areas 3 0.0
<br />1(exclude acres where Phase III release has been achieved)
<br />2 Includes haul and access roads; temporary dams and impoundments; permanent dams and impoundments; diversion and
<br />collector ditches, water and air monitoring sites; topsoil stockpiles; overburden stockpiles; repair, storage and construction areas;
<br />office area, repair shops, and parking; coal stockpiles, loading, and processing areas; railroads; coal conveyors; nonbackfilled and
<br />graded areas of refuse piles, coal mine waste impoundments, head -of -hollow fills, and valley fills; ventilation shafts and entryways;
<br />and noncoal waste disposal area (garbage dumps and coal combustion by-products disposal areas).
<br />3 Includes pits, topsoil stripped areas in advance of pits, and spoil not backfilled and graded
<br />Last Years
<br />This
<br />Greater
<br />Cumulative
<br />Calendar
<br />Cumulative
<br />10 years or
<br />than 10
<br />Total
<br />year
<br />Total '
<br />less
<br />years'
<br />Acres seeded*
<br />123.9
<br />+
<br />0.0
<br />=
<br />123.9
<br />=
<br />. `
<br />a�
<br />*i n..1, 4- iF .,
<br />�__
<br />.
<br />I .. ..,.,,,,,,,,,.,j, —,N-,-„ vi ally auyIIICInCu sCeunly ur Cultural practices
<br />For the Entire Life of Mine the total number of acres disturbed 155.6 and the total number of acres:
<br />Phase I released 122.1 Phase II released 0.0 Phase III released 27.2
<br />For Mines in Permanent Cessation:
<br />Total acreage in facilities subject to reclamation but yet to be completed 1 .8
<br />For Government Performance and Results Act
<br />Acreage in long-term mining or reclamation facilities 25'9
<br />Acreage in active mining areas 3 0.0
<br />1(exclude acres where Phase III release has been achieved)
<br />2 Includes haul and access roads; temporary dams and impoundments; permanent dams and impoundments; diversion and
<br />collector ditches, water and air monitoring sites; topsoil stockpiles; overburden stockpiles; repair, storage and construction areas;
<br />office area, repair shops, and parking; coal stockpiles, loading, and processing areas; railroads; coal conveyors; nonbackfilled and
<br />graded areas of refuse piles, coal mine waste impoundments, head -of -hollow fills, and valley fills; ventilation shafts and entryways;
<br />and noncoal waste disposal area (garbage dumps and coal combustion by-products disposal areas).
<br />3 Includes pits, topsoil stripped areas in advance of pits, and spoil not backfilled and graded
<br />
|