My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-11-16_PERMIT FILE - C1981019 (6)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981019
>
2015-11-16_PERMIT FILE - C1981019 (6)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:12:34 PM
Creation date
2/19/2016 10:25:09 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019A
IBM Index Class Name
Permit File
Doc Date
11/16/2015
Section_Exhibit Name
Rule 4 Performance Standards -ST
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RULE 4 PERFORMANCE STANDARDS <br />4.30 CESSATION OF OPERATIONS <br />4.30.1 Temporary <br />If, for any unforeseeable circumstances, temporary cessation of mining and reclamation operations at the <br />Colowyo operation becomes necessary for a period of thirty (30) days or more, Colowyo will submit to the <br />Division a notice of intention to temporarily cease or abandon mining and reclamation activities. This notice <br />will include a statement of the exact number of acres which will have been affected in the permit area prior to <br />temporary cessation, the accomplished, an identification of back filling, regarding, revegetation, <br />environmental monitoring, and water treatment activities that will continue during temporary cessation. <br />4.30.2 Permanent <br />At the permanent conclusion of surface mining operations, Colowyo will close, backfill, or otherwise <br />permanently reclaim all affected areas. The reclamation plans are set forth in Section 2.05.5. The projected <br />post- mining topography is set forth on the Post - mining Topography maps (maps 19A and 1913). <br />Colowyo will remove any equipment, structures, or other facilities at the conclusion of mining activities and <br />will reclaim the affected land. <br />South Taylor/Lower Wilson — Rule 4, Page 24 Revision Date: 10/31/13 <br />Revision No.: MR -129 <br />
The URL can be used to link to this page
Your browser does not support the video tag.