Laserfiche WebLink
Colorado Division of Reclamation, Mining, and Safety <br />Annual Reclamation Report for the Year 2015 <br />Foidel Creek CO 82-056 Twentymile Coal, LLC <br />Mine Name Permit # Permittee <br />Address: 29515 RCR27 Oak Creek, Colorado 80467 <br />This report, required by Rule 2.04.13, is due by February 15 of each year, or other date, as agreed upon by the <br />Division. It should include text, discussion, and maps, at a minimum, in addition to any other reclamation monitoring data as <br />required by the approved permit. The location of the acreage reported under each land status category and year of seeding (if <br />applicable) should be clearly and accurately identified on a map included with the report. <br />Land Status Category <br />Last Years <br />Cumulative Total <br />This Calendar Year <br />Cumulative Total t <br />Acres permitted to be disturbed <br />662.4 <br />14.8 <br />726.4 <br />Acres backfilled and graded <br />121.1 <br />0 <br />121.1 <br />Acres topsoiled <br />121.1 <br />0 <br />121.1 <br />Seeding typically begins the minimum 10 -year reclamation liability period. Please report the acres for each category below. <br />Do not include acres that have achieved final, Phase III release. <br />*Include, if necessary, a description of any augmented seeding or cultural practices <br />For the Entire Life of Mine, the total number of acres disturbed: 726.4 and the total number of acres: <br />Phase I released 14.3 Phase II released 0 Phase III released 0 <br />For Mines in Permanent Cessation <br />Total acreage in facilities subject to reclamation but yet to be completed: N/A <br />For Government Performance and Results Act <br />Acreage in long-term term mining or reclamation facilities: 619.5 (from 2015 ARR Disturbed Acreage — includes "Active" and <br />"Pending" with 29.6 ac of 2014-2015 drilling disturbance included in the "Active" category)) <br />Acreage in active mining areas: N/A <br />' Excludes acres where Phase III release has been achieved <br />Includes haul and access roads, temporary dams and impoundments, permanent dams and impoundments, diversion and collector ditches, water and air <br />monitoring sites, topsoil stockpiles, overburden stockpiles, repair, storage and construction areas, office area, repair shops, and parking, coal stockpiles, <br />loading, and processing areas. railroads, coal conveyors, refuse piles and coal mme waste impoundments, head -of -hollow tills, valley tills, ventilation <br />shafts and entryways, and noncoal waste disposal area (garbage dumps and coal combustion by-products disposal areas) <br />` Includes pits, topsoil stripped areas in advance of pits, and spoil not backfilled and graded <br />Last Years <br />Cumulative This Calendar <br />Cumulative <br />10 years or less Greater than <br />Total year <br />Total' <br />10 years t <br />Acres seeded* <br />156.7 0.0 <br />156.7 <br />0 <br />*Include, if necessary, a description of any augmented seeding or cultural practices <br />For the Entire Life of Mine, the total number of acres disturbed: 726.4 and the total number of acres: <br />Phase I released 14.3 Phase II released 0 Phase III released 0 <br />For Mines in Permanent Cessation <br />Total acreage in facilities subject to reclamation but yet to be completed: N/A <br />For Government Performance and Results Act <br />Acreage in long-term term mining or reclamation facilities: 619.5 (from 2015 ARR Disturbed Acreage — includes "Active" and <br />"Pending" with 29.6 ac of 2014-2015 drilling disturbance included in the "Active" category)) <br />Acreage in active mining areas: N/A <br />' Excludes acres where Phase III release has been achieved <br />Includes haul and access roads, temporary dams and impoundments, permanent dams and impoundments, diversion and collector ditches, water and air <br />monitoring sites, topsoil stockpiles, overburden stockpiles, repair, storage and construction areas, office area, repair shops, and parking, coal stockpiles, <br />loading, and processing areas. railroads, coal conveyors, refuse piles and coal mme waste impoundments, head -of -hollow tills, valley tills, ventilation <br />shafts and entryways, and noncoal waste disposal area (garbage dumps and coal combustion by-products disposal areas) <br />` Includes pits, topsoil stripped areas in advance of pits, and spoil not backfilled and graded <br />