My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-02-11_PERMIT FILE - C1981019A (3)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981019
>
2016-02-11_PERMIT FILE - C1981019A (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/15/2017 9:50:09 AM
Creation date
2/18/2016 9:35:37 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019A
IBM Index Class Name
Permit File
Doc Date
2/11/2016
Doc Name
Cumulative Bond Schedule
Section_Exhibit Name
Exhibit 13C
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COST SUMMARY WORK <br />Task description: Cumalitve Bond for Collom Haul Road <br />Site: Colowyo Coal Mine Permit Action: MR149 <br />PROJECT IDENTIFICATION <br />Task #: 000 State: Colorado <br />Date: 1/14/2016 County: Moffat <br />User: ZTT <br />Agency or organization name: DRMS <br />TASK LIST (DIRECT COSTS) <br />Permit/Job#: C 1981019 <br />Abbreviation: None <br />Filename: CO 19-000 <br />Task <br />Description <br />Form <br />Used <br />Fleet <br />Size <br />Task <br />I Hours <br />Cost <br />001 <br />002 <br />003 <br />004 <br />005 <br />Rip 25,049' of Collom Haul Road <br />RIPPER <br />2 <br />1 <br />3 <br />3 <br />1 <br />10.81 <br />24.00 <br />509.68 <br />63.95 <br />116.00 <br />$11,976.00 <br />$35,241.88 <br />$2,446,377.00 <br />$306,928.00 <br />$150,105.00 <br />Remove Collom Haul Road Culverts <br />DEMOLISH <br />Haul Spoil to Collom Haul Road <br />SCRAPERI <br />Haul Topsoil to Collom Haul Road <br />SCRAPERI <br />Seed & Reseed Haul Road Disturbance <br />Sagebrush/Steppe mix <br />REVEGE <br />CONTRACT AMOUNT <br />(direct + O & P) = <br />SUBTOTALS: <br />724.44 <br />$2,950,628 <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT: <br />Liability insurance: 2.02 <br />Total = <br />$59,602.69 <br />Performance bond: 1.05 <br />Total = <br />$30,981.59 <br />Job superintendent: 2,086.24 <br />Total = <br />$156,801.80 <br />Profit: 10.00 <br />Total = <br />$295,062.80 <br />TOTAL O & P = <br />$542,448.88 <br />CONTRACT AMOUNT <br />(direct + O & P) = <br />$3,493,076.88 <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT: <br />Financial warranty processing (legal/related costs): <br />0.00 <br />Total = <br />0.00 <br />Engineering work and/or contract/bid preparation: <br />2.00 <br />Total = <br />$69,861.54 <br />Reclamation management and/or administration: <br />1.91 <br />$66,717.77 <br />CONTINGENCY: <br />0.00 <br />Total = <br />$0.00 <br />TOTAL INDIRECT COST = $679,028.19 <br />TOTAL BOND AMOUNT (direct + indirect) = $3,629,656.19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.