Laserfiche WebLink
EXHIBIT 13C <br />CUMULATIVE BOND SCHEDULE <br />Introduction <br />In accordance with Rules 3.02.1(5)(b) and 3.02.1(6), Exhibit 13C presents a cumulative bond <br />schedule for the reclamation of the Collom Haul Road. Please see Figure Exh. 13C-1 for the <br />exact areas covered under this cumulative bond schedule. Also, included with this cumulative <br />bond schedule is the following information: <br />■ Volume of Asphalt for Removal (Table 13C-1) <br />■ Asphalt Ripping Requirements (Table 13C-2) <br />■ A List of Culverts (Table 13C-3) <br />■ Regrade Volumes (Table 13C-4) <br />■ Topsoil Replacement Volumes (Table 13C-5) <br />■ Disturbed Acres to be Seeded (Table 1313-6) <br />■ Colorado Division of Reclamation Mining and Safety's Reclamation Cost Estimate <br />Volume 20 Pagel3C-1 Revision Date: 12/19/15 <br />Revision No.: MR -149 <br />