My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-02-17_REVISION - C1981044
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981044
>
2016-02-17_REVISION - C1981044
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:19:20 PM
Creation date
2/17/2016 2:18:45 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981044
IBM Index Class Name
Revision
Doc Date
2/17/2016
Doc Name
Midterm Review & Reclamation Cost Estimate
From
Jared Ebert
To
Tabetha Lynch
Type & Sequence
MT7
Email Name
JLE
TNL
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
157
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Demo Worksheet Cont'd Task # TTT <br />Page 2 of 151 <br />045 <br />046 <br />047 <br />048 <br />050 <br />051 <br />052 <br />053 <br />054 <br />055 <br />056 <br />057 <br />058 <br />059 <br />060 <br />061 <br />062 <br />063 <br />064 <br />065 <br />066 <br />067 <br />072 <br />074 <br />077 <br />078 <br />079 <br />085 <br />090 <br />091 <br />092 <br />093 <br />100 <br />101 <br />102 <br />103 <br />Regrade Pond 9A -P3 <br />DOZER <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />4 <br />4 <br />4 <br />1 <br />1 <br />1 <br />1 <br />1 <br />4 <br />4 <br />4 <br />4 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />4 <br />1 <br />1 <br />1 <br />0.76 <br />$197.00 <br />$488.00 <br />$1,809.00 <br />$2,602.00 <br />$40,621.00 <br />$5,955.00 <br />$11,301.00 <br />$6,914.00 <br />$496.00 <br />$23,650.00 <br />$14,239.00 <br />$39,988.00 <br />$678.00 <br />$182.00 <br />$187.00 <br />$573.00 <br />$541,648.00 <br />$46,978.00 <br />$65,505.00 <br />$53,312.00 <br />$1,585.00 <br />$223.00 <br />$6,412.00 <br />$2,945.00 <br />$548.00 <br />$6,150.00 <br />$62.00 <br />$194,384.00 <br />$14,136.00 <br />$2,395.00 <br />$40,053.00 <br />$2,197.00 <br />$63,111.00 <br />$22,450.00 <br />$152,518.00 <br />$318,146.00 <br />Regrade Pond 9A -P2 <br />DOZER <br />1.89 <br />Regrade Pond 9A -P4 <br />DOZER <br />7.01 <br />Regrade Ponds HR -PIA and HR-PIB <br />DOZER <br />10.08 <br />Replace Topsoil from Stockpile to Portal No. 9 <br />Berm <br />SCRAPERI <br />51.26 <br />Replace Topsoil from Stockpile to Portal Area <br />Refuse Pile <br />SCRAPERI <br />7.51 <br />Replace Topsoil from NW Stockpile to Refuse Pile <br />SCRAPER] <br />14.26 <br />Replace Topsoil from NE Stockpile to Refuse Pile <br />SCRAPER] <br />8.73 <br />Replace Topsoil from #9 Berm to Refuse Pile <br />SCRAPER] <br />0.63 <br />Replace Topsoil from Stockpile to Portal No. 5 <br />Facilities <br />SCRAPER] <br />29.84 <br />Replace Topsoil from Stockpile to Portal No. 5A <br />SCRAPERI <br />17.97 <br />Replace Topsoil from Stockpile to Portal No. 9 <br />Yard Area <br />SCRAPERI <br />50.46 <br />Replace Topsoil from Stockpile to Old Shop Area <br />DOZER <br />0.47 <br />Replace Topsoil from Stockpile to 7 -North Angle <br />Well Area <br />DOZER <br />0.13 <br />Replace Topsoil from Stockpile to Access Road to <br />Mine No. 5 <br />DOZER <br />0.13 <br />Replace Topsoil from Stockpile to Access Road <br />SCRAPERI <br />0.72 <br />Seed Reclaimed Area with Rangeland/Wildlife <br />Mix <br />REVEGE <br />508.20 <br />Reseed Cropland Areas <br />REVEGE <br />56.25 <br />Reseed Reclaimed Areas with Pasture Mix <br />REVEGE <br />72.20 <br />Weed Spraying - 10% or the Area,Twice/Year for <br />Ten Years <br />REVEGE <br />850.00 <br />Main Substation <br />DOZER <br />1.11 <br />-Regrade <br />Replace Topsoil from Stockpile to Main Substation <br />and Access <br />DOZER <br />0.16 <br />Place Cover on Non -Coal Waste Disposal Area <br />DOZER <br />4.49 <br />Replace Topsoil from Stockpile to Non -Coal <br />Waste Disposal <br />DOZER <br />2.06 <br />Regrade Amoco Pipeline Road <br />DOZER <br />2.12 <br />Regrade Sediment Control Ditches <br />DOZER <br />23.82 <br />Replace Topsoil from Stockpile to Amoco Pond <br />DOZER <br />0.24 <br />Site Maintenance and Pond Cleaning <br />SITEMAINT <br />ENANCE <br />400.00 <br />Mobilize/Demobilize Equipment for Initial <br />Reclamation <br />MOBILIZE <br />5.00 <br />Mobilize/Demobilize Equipment for Pond <br />Removal <br />MOBILIZE <br />3.33 <br />Mobilize/Demobilize Equipment for Yearly Site <br />Maintenance <br />MOBILIZE <br />23.33 <br />Mobilize/Demobilize Equipment for Pond <br />Cleaning <br />MOBILIZE <br />3.33 <br />Grade and Fill Williams Fork Strip Pit <br />DOZER <br />44.15 <br />Topsoil Redistibution at the Williams Fork Strip <br />Pit <br />SCRAPERI <br />28.33 <br />Seed Williams Fork Strip Pit with <br />Rangeland/Wildlife Mix <br />REVEGE <br />143.10 <br />Revegetation of the Utah Tract <br />REVEGE <br />298.50 <br />L_ SUBTOTALS: <br />7054.54 <br />$3,860,632 <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.