Laserfiche WebLink
Demo Worksheet Cont'd Task # TTT Page 46 of 151 <br />Cycle Time: <br />Scraper Loading Time: 1.00 Minutes <br />Maneuver and Spread Time: 0.60 Minutes <br />Job Condition Correction: Site Altitude: 5400 feet <br />Net Correction: 0.830 NA <br />Travel Time: <br />Road Condition: Firm, smooth, rolling, dirt/It. surfaced, watered, maintained 3.0 <br />Haul Route: <br />Seg # <br />Haul Distance (Ft) Grade <br />Roll. Res <br />Total Res <br />% <br />Scraper Push Dozer Source <br />Altitude Adj: <br />1.000 NA (CAT HB) <br />Job Efficiency: <br />0.830 NA (CAT HB) <br />Net Correction: 0.830 NA <br />Travel Time: <br />Road Condition: Firm, smooth, rolling, dirt/It. surfaced, watered, maintained 3.0 <br />Haul Route: <br />Seg # <br />Haul Distance (Ft) Grade <br />Roll. Res <br />Total Res <br />% <br />Velocity <br />QP m <br />Travel Time <br />(min) <br />1 <br />2460.00 7.50 <br />3.00 <br />10.50 <br />922 <br />3.00 <br />2 <br />940.00 6.00 <br />3.00 <br />9.00 <br />1042 <br />0.90 <br />Haul Time: 3.90 minutes <br />Return Route: <br />Seg # <br />Haul Distance (Ft) <br />Grade <br />Roll. Res <br />Total Res Velocity <br />% 00m) <br />Travel Time <br />(min) <br />1 <br />940.00 <br />-6.00 <br />3.00 <br />-3.00 2972 <br />0.39 <br />2 <br />2460.00 <br />-7.50 <br />3.00 <br />-4.50 2972 <br />0.87 <br />Return Time: <br />Total Scraper team cycle time: <br />Adjusted for job conditions: <br />Selected Number of Scrapers: <br />Adjusted single scraper team (unit) hourly production: <br />Adjusted multiple scraper team (fleet) hourly production: <br />Unadjusted unit production/hour: 514.79 LCY/Hour <br />Optimal Number of Scrapers per push <br />dozer: <br />JOB TIME AND COST <br />1.26 minutes <br />6.76 <br />minutes <br />427.28 <br />LCY/Hour <br />2 <br />Scraper(s) <br />427.28 <br />LCY/Hour <br />427.28 <br />LCY/Hour <br />Fleet size: 1 Team(s) Total job time: 2.93 Hours <br />Unit cost: $1.855 /LCY Total job cost: $2,318 <br />CIRCES Cost Estimating Software <br />